The South African energy crisis, most notably manifesting in the form of successive rounds of loadshedding, is an ongoing period of widespread national level rolling blackouts as electricity supply falls behind electricity demand, threatening to destabilize the national power grid. It began in the later months of 2007 and continues to the present.[1][2] The South African government-owned national power utility and primary power generator, Eskom, and various parliamentarians attributed these rolling-blackouts to insufficient generation capacity.[3] With a reserve margin estimated at 8% or below,[4] such "load shedding" is implemented whenever generating units are taken offline for maintenance, repairs or re-fuelling (in the case of nuclear units). According to Eskom and government officials, the solution requires the construction of additional power stations and generators.[5] Corruption and mismanagement of Eskom, most notably during the Jacob Zuma administration, have exacerbated the energy crisis;[6][7][8] incompetence and neglect by Eskom staff[9] in addition to multiple acts of sabotage[10] has also contributed to ongoing power supply problems.

Background

Power Station Maximum Generating Capacity as of 2019

  Coal (83%)
  Pumped Storage (6%)
  Gas (5%)
  Nuclear (4%)
  Hydro (2%)
  Wind (0.2%)

In a December 1998 report, analysts and leaders in Eskom and in the South African government predicted that Eskom would run out of electrical power reserves by 2007 unless action was taken to prevent it.[11][12] To improve power supply and reliability, the 1998 report recommended restructuring Eskom into separate electricity generation and power transmission businesses.[13] Despite the warnings of the 1998 report and requests by Eskom to be allowed to increase capacity national government took no action.[14] At the time the Mbeki government was considering the privatisation of Eskom which was cited as a reason why the government took no action.[14] This resulted in Eskom being unable to add additional generating capacity and thereby keep up with increasing national demand for electricity from 2002 onward.[15]

Aging infrastructure

15 power stations were commissioned between 1961 to 1996, adding a combined 35,804 MW of capacity. In the 21st century, only 9,564 MW of capacity has been added from the currently constructing power stations Medupi and Kusile.[16] Many Eskom power stations are almost 50 years old and near decommissioning.[11] Following the first period of load shedding in 2007 to 2008 Eskom commissioned the construction of the Medupi and Kusile coal fired power plants to expand energy production by 25%. The construction of these plants encountered numerous technical problems and cost overruns whilst the existing fleet of power plants were not replaced and continued to operate past their operational lifespan.[2]

Power Station Commission history

Below is a timeline of Eskom built major power stations[17]

Year Power Plant MegaWatts
1961 Komati 990
1963 Rooiwal 300
1967 Camden 1561
1969 Grootvlei 1180
1970 Hendrina 1893
1971 Arnot 2352
1976 Kriel 3000
1979 Matla 3600
1980 Duvha 3600
1984 Koeberg 1860
1985 Tutuka 3654
1985 Lethabo 3708
1987 Matimba 3990
1988 Kendal 4116
1996 Majuba 4110
2015 Medupi 4764
2017 Kusile 4800

Loadshedding

Eskom Power generation on 27 June 2022, Loadshedding indicated as Orange, showing how Eskom can't generate peak demand[18]
Eskom Loadshedding in GWh[18]

Since the year 2007 South Africa has experienced multiple periods of loadshedding as the country's demand for electricity exceeded its ability, notably Eskom's ability, to supply it. During these periods the power is rationed between different electrical grid areas cross the country and within municipal areas. With areas experiencing power outages typically lasting two to four hours. Although South Africa has a national grid some areas of the country experience more periods of loadshedding than other areas due to differences in local power generation capabilities and difficulties in electrical distribution.

As of December 2019, Eskom have published 8 stages of load shedding, each stage representing the removal of 1000 MW increments of demand by controlled shut down on sections of the supply grid based on a predetermined schedule. Schedules may vary by location. Stage 6 (6000 MW reduction) was implemented the first time on 9 December 2019.[19]

Stages of load shedding and what they mean for the end user:[20][21]
Stage Energy load removed
from the national grid
Typical Impact Percentage of grid
users without power
Stage 1 <1000 MW 6h over 4 days (6/96h) ~6% without power
Stage 2 <2000 MW 12h over 4 days (12/96h) ~12.5% without power
Stage 3 <3000 MW 18h over 4 days (18/96h) ~19% without power
Stage 4 <4000 MW 24h over 4 days (24/96h) ~25% without power
Stage 5 <5000 MW 30h over 4 days (30/96h) ~31% without power
Stage 6 <6000 MW 36h over 4 days (36/96h) ~37% without power
Stage 7 <7000 MW 42h over 4 days (42/96h) ~44% without power
Stage 8 <8000 MW 48h over 4 days (48/96h) ~50% without power

After the 2 hour disconnect period there is typically an additional 30 minutes added to allow for switching on, not counted in the totals as mentioned above. Problems may arise during switch on that can cause an actual fault blackout in the area beyond the scheduled time.

Loadshedding periods

Since 2007 South Africa has experienced at least five distinct periods of load shedding.

First period: 2007 – 2008

The first period of chronic power shortages occurred in late 2007 and lasted until at least May 2008. Investigative television show Carte Blanche reported that part of the problem is related to the supply of coal to the coal-fired power plants.[22][23] Several other causes have been postulated, including skills shortages[5] and increasing demand for electricity around the country.[24]

Eskom was criticised for exporting electricity to neighbouring African states while not having the capacity to meet South Africa's demand.[25] Eskom, however, announced on 20 January 2008 that it had ceased to export power.[26][27] The government claimed the shortage had caught them by surprise since the South African economy had grown faster than expected; however, their target growth rate of 6% per year was not reached from 1996 to 2004. The average GDP growth rate during this period was 3.1%.[28] The year 2012 was frequently mentioned as the earliest possible end to the power shortages.[5][29][30]

Second period: November 2014 – February 2015

The Majuba power plant lost its capacity to generate power after a collapse of one of its coal storage silos on 1 November 2014. The Majuba power plant delivered approximately 10% of the country's entire capacity and the collapse halted the delivery of coal to the plant.[31] A second silo developed a major crack on 20 November causing the shut down of the plant again, this after temporary measures were instituted to deliver coal to the plant.[32]

On 5 December 2014, Eskom started major stage three load shedding in South Africa after the shut down of two power plants on 4 November (of said year) due to diesel shortages. It was also reported that the Palmiet and Drakensberg Pumped Storage Schemes were also experiencing difficulties due to a depletion of water reserve to the Hydro plants. Stage three was the highest degree of load shedding then.[33]

On Thursday 4 November, Eskom fell 4,000 megawatts (5,400,000 hp) short of the country's electricity demand of 28,000 megawatts (38,000,000 hp). The power utility has the ability to produce 45,583 megawatts (61,128,000 hp) but could only supply 24,000 megawatts (32,000,000 hp) due to "planned and unplanned" maintenance. One turbine at Eskom's Duvha Power Station is still out of commission due to an "unexplained incident" in March 2014.[34] Load shedding was scheduled to resume in February 2015, due to industry start up, after the December holiday period.

Third period: February 2019 – March 2019

Another period of load shedding began in February 2019 when Eskom announced level 4 load shedding due to the temporary loss of generating capacity. This necessitated the dropping of 4,000 MW of power consumption from the national grid.[35] In mid-March of that year extensive ongoing power cuts were implemented across the country by Eskom as part of the level 4 load shedding.[36]

Fourth period: December 2019 – March 2020

Eskom implemented a further round of load shedding commencing in December 2019. South Africa is currently experiencing its worst energy crisis, when Load Shedding Stage 6 activated for the first time ever in December.[37] Eskom stated that of its total nominal capacity of around 44,000 MW, it was unable to provide around 13,000 MW of total capacity, resulting in the nationwide blackouts.[38]

A combination of factors were blamed for the fourth period of load shedding ranging from weather to allegations of sabotage and neglect. Unusually heavy rains in the highveld region of South Africa resulted in wet coal and flooding leading to a number of plants being unable to operate effectively,[39][40] most notably at Medupi power station.[38] President Cyril Ramaphosa stated that an additional reason for the load shedding was the loss of 2,000 MW due to alleged sabotage by an Eskom employee.[41][42] Eskom chief operations officer, Jan Oberholzer, publicly stated that the primary reason for load shedding was due to a lack of maintenance and neglect over the preceding twelve years resulting in an unpredictable and unreliable system.[43] South African opposition parties criticized the African National Congress and president Ramaphosa for the way in which they handled the crisis.[44] An additional round of load shedding (stage 4)[45] was initiated in March 2020 when the Koeberg Nuclear power station experienced a fault with one of the sea water cooling pumps.[46]

Fifth period: March 2021 - Present

During the COVID-19 pandemic and resulting economic slowdown load shedding was largely suspended due to reduced demand for electricity. This ended in March 2021, when Matimba, Tutuka, Majuba, Kusile, Duvha, Kriel, Kendal and Medupi power stations experienced breakdowns.[47] In May 2021, stage 2 load-shedding was reimplemented following multiple power station breakdowns at Tutuka, Majuba, Kriel, Matla, Kusile, Medupi and the Duvha power stations.[48] By 9 June 2021 level 4 load shedding was announced.[49]

On 10 June 2021 President Ramaphosa announced that the Electricity Regulation Act would be amended to increase the threshold for exemption from applying for a license from national energy regulator Nersa to generate electricity, thereby increasing the exemption threshold from 1 megawatt to 100 megawatts.[50][51] This would allow private power producers to more easily add power production capacity to the national grid.[51]

After providing uninterrupted power for 77 days, Eskom announced on 7 October 2021 that stage 2 load shedding would resume due to planned and unplanned outages.[52][53]

On 25 October 2021, Eskom announced that capacity would remain "constrained" through August 2022, with negative effects on the economy. Eskom also estimated that an additional 4000MW to 6000MW of generation capacity would be required to remove the risk of loadshedding.[54][55] On 27 October 2021 Eskom announced that stage 4 load shedding would be implemented for three days due to problems with the Medupi, Kusile, Matla, Lethabo and Arnot power stations.[56] That same day, the ANC spokesperson Pule Mabe raised concerns that the recent load shedding schedule may be politically motivated, given the upcoming municipal elections.[57]

Following the municipal elections, stage 4 load shedding recommenced on 5 November due to problems at Kendal, Tutuka, Matimba, Majuba and Lethabo power stations.[58] In a post-election address on 8 November, President Ramaphosa remarked that the continuing reliance on Eskom, as the sole national generator, was a central risk to the power supply system.[59]

Eskom announced that level 2 load shedding would be re-implemented from 2 February to 7 February 2022 due to the breakdown of two generating units at the Kusile and Kendal power stations.[60] In early March 2022 level 4 load shedding was announced due to breakdowns taking 15,439MW out of the national grid.[61][62] Stage 4 load shedding was extended over the 2022 Easter weekend when roughly half the national grid failed.[63]

June 2022 strike

Load shedding increase to level 4 and then level 6 nationally in late June 2022 following unlawful strike action by NUMSA and NUM employees.[64][65][66][67] The loss of generating capacity due to strike action was in addition to a loss of 2,766MW from planned maintenance and another 17,395MW from power station breakdowns.[66] As the strike action continued Eskom warned that it might be necessary to implement stage 6 load shedding.[68] On 28 June 2022, Eskom confirmed that stage six load shedding would be implemented that evening, only the second time since December 2019.[69] By the end of June the strike was effectively ended when Eskom agreed to restart wage negotiations.[67]

September 2022 crisis

South Africa's energy grid experienced a notable collapse in generating capacity in mid-September 2022 that resulted in up to half of Eskom's generating capacity being lost.[70]

Eskom announced that due to fires[70] and a broken coal conveyor belt at Kendal power station,[71][72] and an electrical trip during testing at Koeberg Nuclear power station[73] level 4 load shedding would be implemented;[71] a week later level 5 load shedding was declared.[74] The day after the implementation of level 5 loadshedding was announced generators at the Kusile and Kriel power stations tripped thereby forcing Eskom to implement level 6 loadshedding[75] with the prospect of level 8 being implemented.[76]

By the end of September, 2022 had had more load shedding than all previous years combined.

Sabotage

On 19 November 2021, Eskom announced that sabotage of electrical infrastructure, as well as corruption, may be contributing to power supply problems. An initial forensic investigation found evidence that recent damage to a coal conveyor at Lethabo was the result of deliberate sabotage. Steel supports had been severed, causing a power supply pylon to collapse.[77][78] In a media briefing, de Ruyter commented that the matter had been referred to the Hawks for further investigation.[79] Despite investigations and disciplinary action, acts of sabotage continued into May 2022, when it was revealed that multiple incidents had occurred at several plants.[80] In May 2022 the Minister for Public Enterprises, Pravin Gordhan, reported to Parliament that additional incidents of cables being cut intentionally by saboteurs, rising theft at its power plants, and corruption around the supply of fuel oil, had greatly worsened the energy crisis and Eskom's ability to resolve it.[81] South African journalist Kyle Cowan has speculated that the motivation for these acts of sabotage are politically motivated by unknown groups or individuals within Eskom involved in corruption.[82]

Impact

The energy crisis has had a number of negative impacts on South Africa. These range from reducing economic growth[15][83] and making it more difficult to do business in the country[84][85] to increasing crime rates[86][87] and shaping South African politics.[88][89] A study by the University of Johannesburg indicated that since level 6 load shedding was introduced the repeated periods of load shedding has significantly reduced "the overall happiness of South Africans."[90]

Crime

In 2022 it was reported that long periods of loadshedding was resulting in increased incidents of crime.[86][91][87] This included metal thieves using periods of when there is no power to steal equipment from power stations, sub-stations, and transmission lines thereby complicating Eskom's efforts to mitigate the energy crisis and costing the utility over R16.8 billion[92] (US$ 93.7 million) whilst also causing additional difficulties for municipalities.[93] Incidents of metal theft, house breaking and robberies due to a lack of security lighting had increased in some urban areas of South Africa during the period when level 6 loadshedding was implemented.[86][91][94][95][96]

Economic effects

South African cents per kWh of electricity, 1994 to 2020, with the start of the South African energy crisis in 2007 marked on the chart[97] The start of the energy crisis was also the start of a long period of increases in the price of electricity in South Africa.

The energy crisis has significantly limited economic growth in South Africa thereby preventing the country from resolving high rates of unemployment.[15][83] The power shortage is estimated to have reduced economic growth in 2021 by 3% thereby costing the country an estimated 350,000 potential new jobs for that year alone.[15] In 2022 the insurance company Sanlam reported that the cost of replacing appliances due to power surges following loadshedding periods had exceeded the cost of replacing appliances due to burglaries.[98]

In 2022 the business analysis firm Intellidex estimated that it would cost South Africa R500 billion (US$28 billion) to resolve the energy crisis within three years.[99]

Business

As of 2008 big companies with international investors were also affected by the electricity crisis and announced these effects to the international community, bringing the situation to the attention of potential foreign investors.[100] Load shedding in the first six months of 2015 was estimated to have cost South African businesses R13.72 billion in lost revenue with an additional R716 million spent by businesses on backup generators.[101]

Banks and telecommunications companies have generally continued to operate as usual thanks to existing backup systems. However, as of November 2021 load shedding has led to diminished mobile network coverage, as backup batteries have also been stolen and cellphone stations vandalised during power outages.[102]

In 2019 small business owners said that load shedding was the number one challenge that they faced. In a small business sentiment report of 3984 small business owners 44% said that they had been severely affected by load shedding with 85% stating that it had reduced their revenue. As a result, 40% of small businesses lost revenue of 20% or more during the load shedding period while 20% of owners claimed that if load shedding were to continue at similar levels to Q1 of 2019, they would have to consider reducing their staffing levels or closing their business.[103]

Mining

In January and February 2008 global platinum and palladium prices hit record highs[104] as mines were first shut down and subsequently restricted in their electricity use. South Africa supplies 85% of the world's platinum and 30% of palladium. Mining companies estimate that hundreds of thousands of ounces of both gold and platinum production will be lost every year until the crisis passes.[105] Due primarily to the impact on mining companies, economists in 2011 downgraded GDP growth forecasts significantly. The consensus hovered around 4% (well short of the 6% government target), with the caveat that growth could reduce by 20 basis points every month under certain circumstances.[106]

Crisis management

As of February 2008 blackouts were temporarily halted due to reduced demand and maintenance stabilization.[107] This drop in demand was caused by many of the country's mines shutting down or slowing to help alleviate the burden. However, regularly scheduled mandatory load shedding started in April 2008, to allow maintenance periods of power generators, and recovery of coal stockpiles before the winter, when electricity usage is expected to surge.

Expanding generating capacity will see an estimated spend of R280 billion over the next five years from 2015 on wards,[108] with around 20 000 megawatts of additional capacity due to be online by 2025.[109] However, neither short nor long term funding has yet been secured and the downgrading of Eskom's credit rating has ignited speculation of a capital injection by the government.[110]

On 11 December 2014 it was announced that President Jacob Zuma had assigned Deputy President Cyril Ramaphosa to oversee the turnaround of three state owned companies namely "Eskom, the South African Airways, and the South African Post Office", all of which were in dire straits.[111]

On 15 January 2015 Eskom's then CEO Tshediso Matona admitted that Eskom's policy to "Keep the Lights on" meant that power station maintenance was neglected for years, and that South Africans will have to get used to electricity blackouts for the next four to five years.[111] In December that year an agreement between Eskom and Areva to replace steam generators at the Koeberg nuclear plant was judged "unlawful", by the Supreme Court of Appeal, bringing the utility company's tender process into question.[112]

In late 2016, Standard & Poor's Global Ratings downgraded Eskom's credit rating further into sub-investment cutting its long-term credit rating to BB - two levels below the investment threshold.[113] In the same year Matshela Koko, former head of generation for Eskom, was named as acting CEO.[114] Eskom stated it intended to pursue a nuclear solution to current energy woes. According to projections from late 2016, the use of nuclear power would provide over 1000GW of power by 2050. In preparation, the company launched a training program for 100 technicians, engineers and artisans to certify them as nuclear operators.[115] In January 2018 Eskom's acting Chief Financial Officer stated that the company could not afford a new build, following a 34% drop in interim profits due to declining sales and increasing financing costs. The government stated it would proceed with the plan but more slowly.[116]

In 2018, the National Energy Regulator of South Africa denied an application by Eskom to increase electricity tariffs by a future 19.9% for the financial year 2018/19. The regulator instead granted a 5.2% increase and gave a list of reasons for the refusal to grant higher tariffs that the South African newspaper Business Day stated painted "a picture of inefficiency, inaccurate forecasting and cost overruns" at the power utility. Part of the refusal was the finding that Eskom had an additional 6,000 employees that were not needed, costing the company R3.8 billion annually.[117] On 28 March 2018 Moody's Investors Service downgraded Eskom's credit rating to B2 from B1 stating that it was concerned with "the lack of any tangible financial support for the company in the February state budget".[118]

On 24 November 2020, Moody's further downgraded Eskom's long-term credit rating to Caa1.[119] This places Eskom's credit within the "speculative grade" of investment, with a "very high credit risk".

In an attempt to mitigate the impact of the energy crisis the City of Cape Town has adopted a range of local policies to even out local electricity demand on a daily basis as of 2022.[120] This includes using the Steenbras Dam pumped water scheme to reduce the impact by up to two loadshedding levels.[121]

See also

References

  1. ^ "Green Carbon SA". 18 July 2008.
  2. ^ a b Rathi, Anusha. "Why South Africa Is in the Dark, Again". Foreign Policy. Retrieved 19 September 2022.
  3. ^ What is Load Shedding Archived 9 April 2008 at the Wayback Machine
  4. ^ Hartleb, Thomas (11 February 2008). "Expect Tight Energy Supply for Four Years". Mail & Guardian. Retrieved 25 July 2016.
  5. ^ a b c "News24, South Africa's premier news source, provides breaking news on national, world, Africa, sport, entertainment, technology & more". News24. Archived from the original on 4 February 2008. Retrieved 5 February 2008.
  6. ^ Staff Writer. "How the ANC government broke Eskom – 2008 versus 2018". Retrieved 27 October 2021.
  7. ^ Grootes, Stephen (3 June 2021). "ANALYSIS: Thirteen wasted years later, our electricity network is crumbling – and South Africa with it". Daily Maverick. Retrieved 27 October 2021.
  8. ^ "Problems at Eskom Identified as a Main Cause of SA's Energy Crisis". College of Agriculture, Engineering and Science. Retrieved 27 October 2021.
  9. ^ Staff Writer (3 November 2021). "Corruption still rife at Eskom". My Broadband. Retrieved 5 November 2021.
  10. ^ Cowan, Kyle (2022). Sabotage: Eskom Under Siege. Penguin Books. ISBN 978-1776390595.
  11. ^ a b "News24, South Africa's premier news source, provides breaking news on national, world, Africa, sport, entertainment, technology & more". News24. Archived from the original on 27 January 2008. Retrieved 31 January 2008.
  12. ^ Department of Minerals and Energy (December 1998). White Paper on the Energy Policy of the Republic of South Africa (PDF) (Report). Department of Minerals and Energy. p. 41. Archived (PDF) from the original on 15 October 2021. Retrieved 8 October 2021.
  13. ^ Department of Minerals and Energy (December 1998). White Paper on the Energy Policy of the Republic of South Africa (PDF) (Report). Department of Minerals and Energy. pp. 55–56. Archived (PDF) from the original on 15 October 2021. Retrieved 29 October 2021.
  14. ^ a b "The state of electricity in South Africa - Part I: The problems in Eskom". Helen Suzman Foundation. Retrieved 6 January 2021.
  15. ^ a b c d Inglesi-Lotz, Roula. "South Africa's economic growth affected by mismatch of electricity supply and demand". The Conversation. Retrieved 20 September 2022.
  16. ^ Steyn, Lisa. "Shutting old power plants is the simple solution to load shedding woes, expert says". Fin24. Retrieved 29 June 2022.
  17. ^ "Dark history: The real reason behind load shedding in SA". BizNews.com. 5 July 2021. Retrieved 29 June 2022.
  18. ^ a b "Station build-up for yesterday - Eskom Data Portal". 18 November 2020. Retrieved 29 June 2022.
  19. ^ "Eskom is now rationing electricity at stage 6 – here's what that means". BusinessInsider. Retrieved 17 December 2019.
  20. ^ "Eskom load shedding: Interpreting Eskom load-shedding stages". loadshedding.eskom.co.za. Retrieved 17 December 2019.
  21. ^ Staff Writer. "What stage 8 load shedding means for South Africa". businesstech.co.za. Retrieved 17 December 2019.
  22. ^ Eskom's darkest hour Archived 31 January 2008 at the Wayback Machine
  23. ^ Myburgh, James (1 February 2008). "Eskom: The Real Source of the Crisis". politicsweb. Retrieved 25 July 2016.
  24. ^ "News24, South Africa's premier news source, provides breaking news on national, world, Africa, sport, entertainment, technology & more". News24. Archived from the original on 28 January 2008. Retrieved 5 February 2008.
  25. ^ "Zim's 'free' Eskom power ride". Fin24. 18 January 2008. Archived from the original on 19 January 2008.
  26. ^ "News24, South Africa's premier news source, provides breaking news on national, world, Africa, sport, entertainment, technology & more". News24. Archived from the original on 23 January 2008. Retrieved 28 January 2008.
  27. ^ "Archived copy". iafrica.com. Archived from the original on 12 August 2007. Retrieved 6 June 2022.{{cite web}}: CS1 maint: archived copy as title (link)
  28. ^ Microsoft Word - P0441 Nov05.doc
  29. ^ No more mega projects until 2012 - Eskom
  30. ^ Matthew Hill. "Eskom to invite more cogeneration projects, hopes to fast track some". Engineering News.
  31. ^ "Video Majuba power station seconds silo collapse". The citizen. 4 November 2014. Archived from the original on 11 December 2014. Retrieved 6 December 2014.
  32. ^ "Eskom admits another coal-storage silo at Majuba is cracked". Business day live. 21 November 2014. Archived from the original on 11 December 2014. Retrieved 6 December 2014.
  33. ^ "Tripped coal stations add to load shedding burden". Business day live. 5 December 2014. Retrieved 6 December 2014.
  34. ^ "This is a catastrophe: electricity expert". Moneyweb. 6 December 2014. Retrieved 6 December 2014.
  35. ^ "Eskom announces stage 4 load shedding". ewn.co.za. Eyewitness News. Retrieved 12 February 2019.
  36. ^ Dlulane, Bonga. "Eskom load shedding at crisis levels, says energy expert". ewn.co.za. Retrieved 19 March 2019.
  37. ^ Nkanjeni, Unathi (10 December 2019). "Stages 6 to 8 load-shedding: What it means and how it affects you". Times Live. Retrieved 5 April 2020.
  38. ^ a b "Eskom steps up power cuts after flooding hits major plant". Moneyweb. 9 December 2019. Retrieved 17 December 2019.
  39. ^ Lindeque, Mia. "Eskom: Heavy rain in Mpumalanga still impacting coal supply". ewn.co.za. Retrieved 17 December 2019.
  40. ^ "Flooding a major factor in move to stage 6 load shedding - Eskom". Fin24. 9 December 2019. Retrieved 17 December 2019.
  41. ^ "Criminal case reportedly lodged against Eskom 'saboteur'". citizen.co.za. 16 December 2019. Retrieved 17 December 2019.
  42. ^ Mahlakoana, Theto. "Sabotage a factor in load shedding, says Ramaphosa". ewn.co.za. Retrieved 17 December 2019.
  43. ^ Retief, Hanlie (16 December 2019). "'Eskom is captured': Jan Oberholzer on wet coal, sabotage and stage 6 desperation". CityPress. Retrieved 17 December 2019.
  44. ^ "'Unparalleled incompetence': Political parties react to stage 6 load-shedding". TimesLIVE. Retrieved 17 December 2019.
  45. ^ Hlatshaneni, Simnikiwe (11 March 2020). "Now Koeberg reactor's pumps get blamed for load shedding". The Citizen. Retrieved 11 March 2020.
  46. ^ "Stage 4 load shedding extended until further notice". www.capetownetc.com. Retrieved 11 March 2020.
  47. ^ "Load shedding to continue until Wednesday". SAnews. 15 March 2021. Retrieved 18 May 2021.
  48. ^ "Load-shedding suspended until Tuesday evening". www.engineeringnews.co.za. News24Wire. Retrieved 18 May 2021.
  49. ^ "Eskom ramps up load shedding to stage 4 for Wednesday". ewn.co.za. Eyewitness News. Retrieved 11 June 2021.
  50. ^ "Ramaphosa announces energy reform at last, opens up independent power generation". www.msn.com. Retrieved 11 June 2021.
  51. ^ a b "Ramaphosa unveils policy amendments to help struggling Eskom". The Mail & Guardian. 10 June 2021. Retrieved 11 June 2021.
  52. ^ Mashego, Penelope (7 October 2021). "Eskom to implement stage 2 load shedding at 9pm on Thursday and Friday". News24. Retrieved 8 October 2021.
  53. ^ Khumalo, Sibongile (8 October 2021). "'It's very severe' - Alarming chunk of Eskom capacity is down as load shedding hits again". News24. Retrieved 8 October 2021.
  54. ^ "Eskom pledges to continue increased reliability maintenance programme to improve power system reliability". Eskom. 25 October 2021. Retrieved 26 October 2021.
  55. ^ Stoddard, Ed (25 October 2021). "Candle in the wind: Eskom warns of another year of load shedding". Daily Maverick. Retrieved 26 October 2021.
  56. ^ "SA to jump to Stage 4 load shedding until Friday". Fin24. Retrieved 27 October 2021.
  57. ^ Gerber, Jan (27 October 2021). "ANC demands answers on Eskom's planned Stage 4 load shedding, suggests political motive". News24. Retrieved 27 October 2021.
  58. ^ "Load shedding escalates to Stage 4". News24. 5 November 2021. Retrieved 5 November 2021.
  59. ^ Omarjee, Lameez (8 November 2021). "'Complex' Eskom problem keeping Ramaphosa awake at night". News24. Retrieved 8 November 2021.
  60. ^ "Stage 1 load shedding for City of Cape Town customers as power outages return". www.iol.co.za. Retrieved 3 February 2022.
  61. ^ Areff, Ahmed. "More darkness ahead as Stage 4 load shedding kicks in on Wednesday morning". Fin24. Retrieved 9 March 2022.
  62. ^ Jordaan, Nomahlubi (9 March 2022). "Eskom to implement stage 4 load-shedding". TimesLIVE. Retrieved 9 March 2022.
  63. ^ Haffajee, Ferial (19 April 2022). "ESKOM ALERT: Stage 4 power cuts hit South Africa as nearly half the grid fails over Easter". Daily Maverick. Retrieved 20 April 2022.
  64. ^ "Eskom ramps up power cuts to stage 4 due to strike action at power stations". ewn.co.za. Eyewitness News. Retrieved 25 June 2022.
  65. ^ Mkentane, Luyolo (27 June 2022). "Eskom's biggest unions distance themselves from illegal strike". BusinessLIVE. Retrieved 28 June 2022.
  66. ^ a b van der Merwe, Compiled by Marelise. "Load shedding to hit stage 4 all weekend after wage talks deadlock - Eskom". Fin24. Retrieved 25 June 2022.
  67. ^ a b Stoddard, Ed; Stoddard, Ed (28 June 2022). "POWER CRISIS: Eskom strike appears to be over after unions call on workers to 'normalise the situation'". Daily Maverick. Retrieved 26 September 2022.
  68. ^ de Bruyn, Chanel. "Eskom warns of high risk of Stage 6 load-shedding on Tuesday night amid ongoing strike". www.engineeringnews.co.za. Retrieved 28 June 2022.
  69. ^ "Load shedding escalated to Stage 6". News24. Fin24. 28 June 2022. Retrieved 28 June 2022.
  70. ^ a b Cowan, Kyle. "Inside Eskom's week from hell – fires, broken conveyors and disaster as 50% of generation capacity fails". News24. Retrieved 17 September 2022.
  71. ^ a b "Eskom intensifies load shedding to Stage 4". Moneyweb. 13 September 2022. Retrieved 17 September 2022.
  72. ^ News24Wire. "Cascading problems after Kendal coal conveyor belt broke led to Stage 4". www.engineeringnews.co.za. Retrieved 19 September 2022.
  73. ^ Ngcuka, Onke (15 September 2022). "POWER CRISIS: Calls for Eskom to lift veil of silence on R20bn plan to extend Koeberg's lifespan". Daily Maverick. Retrieved 17 September 2022.
  74. ^ "Eskom moves to Stage 5 load shedding until Monday morning". Moneyweb. 17 September 2022. Retrieved 17 September 2022.
  75. ^ "Grin and bear it SA, Eskom is implementing stage 6 rolling blackouts". TimesLIVE. Retrieved 18 September 2022.
  76. ^ Haffajee, Ferial (18 September 2022). "ROLLING BLACKOUTS: Waking up to Stage 6, now Eskom execs are fighting to fend off Stage 8 power cuts". Daily Maverick. Retrieved 19 September 2022.
  77. ^ Cowan, Kyle (19 November 2021). "Eskom finds evidence of sabotage at Lethabo Power Station - pylon supports were cut". News24. Retrieved 19 November 2021.
  78. ^ Haffajee, Ferial (19 November 2021). "André de Ruyter: Deliberate acts of sabotage are causing power cuts". Daily Maverick. Retrieved 19 November 2021.
  79. ^ Tshikalange, Shonisani (19 November 2021). "Eskom finds evidence of sabotage at Lethabo Power Station". TimesLIVE. Retrieved 19 November 2021.
  80. ^ Cowan, Kyle (20 May 2022). "Further incidents of sabotage at Eskom power stations thwart efforts to halt load shedding". News24. Retrieved 20 May 2022.
  81. ^ "Saboteurs threaten South Africa's power supply". TechCentral. 20 May 2022. Retrieved 23 May 2022.
  82. ^ [WATCH] Sabotage: Eskom Under Siege – Kyle Cowan, PolitySA, 19 July 2022, retrieved 18 September 2022
  83. ^ a b Heinemann, Tim (14 May 2019). "Energy crisis in South Africa – a barrier to higher economic growth" (PDF). KFW.
  84. ^ "Five factors that small businesses face during loadshedding". iol.co.za. 10 December 2019. Retrieved 25 September 2022.
  85. ^ Leshoro, Dimakatso. "Small business buckle under relentless load shedding". Citypress. Retrieved 25 September 2022.
  86. ^ a b c Payne, Suné; Payne, Suné (6 July 2022). "POWER CUTS: Criminals are enjoying load shedding, say Cape Town communities affected by crime". Daily Maverick. Retrieved 25 September 2022.
  87. ^ a b Writer, Staff. "Increase in home break-ins during longer load shedding periods". Retrieved 25 September 2022.
  88. ^ Gerber, Jan. "Load shedding: DA and EFF's divergent approaches to South Africa's energy crisis". News24. Retrieved 25 September 2022.
  89. ^ Merten, Marianne; Merten, Marianne (30 September 2021). "ROAD TO 2021 LOCAL ELECTIONS: Political party manifestos haul out the promises — oops, it's now 'commitments' — to woo voters". Daily Maverick. Retrieved 25 September 2022.
  90. ^ McCain, Nicole. "Happiness index shows South Africans are furious about load shedding - and it could lead to protests". News24. Retrieved 25 September 2022.
  91. ^ a b "'Opportunistic' criminals are taking advantage of load shedding - WC CPF". CapeTalk. Retrieved 25 September 2022.
  92. ^ "LISTEN: Criminals taking advantage of load shedding to steal equipment, says De Ruyter". Jacaranda FM. Retrieved 25 September 2022.
  93. ^ Pijoos, Iavan. "City of Joburg to cough up R6m on repairs to damaged substations due to load shedding, cable theft". News24. Retrieved 25 September 2022.
  94. ^ Pillay, Yogashen. "Load shedding gives criminals the upper hand and cripples the economy". www.iol.co.za. Retrieved 25 September 2022.
  95. ^ Writer, Staff. "How criminals are taking advantage of increased load shedding in South Africa". Retrieved 25 September 2022.
  96. ^ "Criminals are using power blackouts to their advantage: ISS". SABC News. 9 November 2021. Retrieved 25 September 2022.
  97. ^ Labuschagne, Hanno (17 August 2020). "Eskom electricity prices – 1994 to 2020". My Boardband. Retrieved 3 May 2022.
  98. ^ Buthelezi, Londiwe. "Load shedding claims now exceed burglaries, fuelling premium hikes, says Sanlam". Fin24. Retrieved 25 September 2022.
  99. ^ Sguazzin, Antony. "SA needs R500 billion to end load shedding, says Intellidex". Fin24. Retrieved 18 September 2022.
  100. ^ Harmony Gold expects to get 75 pct of power needs from Eskom until Wednesday Archived 31 January 2008 at the Wayback Machine
  101. ^ Goldberg, Ariel (9 November 2015). "The economic impactof load shedding: The case of South African retailers" (PDF). Gordon Institute of Business Science. p. 109 – via University of Pretoria.
  102. ^ Daniel, Luke (10 November 2021). "Cellphone towers are crippled by load shedding – and theft of at least 200 batteries each month". Business Insider South Africa. Retrieved 10 November 2021.
  103. ^ "How does loadshedding affect small business in SA?". The Yoco Small Business Pulse (3: Q1 2019): 3.
  104. ^ "Platinum Price Today | Price of Platinum Per Ounce | 24 Hour Spot Chart | KITCO". www.kitco.com. Retrieved 27 May 2021.
  105. ^ "IOL Business". IOL. Archived from the original on 19 November 2020. Retrieved 12 February 2019.
  106. ^ Three phase electricity Archived 18 July 2011 at the Wayback Machine
  107. ^ "Archived copy". Archived from the original on 3 April 2017. Retrieved 12 February 2019.{{cite web}}: CS1 maint: archived copy as title (link)
  108. ^ "$83 Billion in South Africa Spending Fails to Keep Lights On". Bloomberg.com. 11 May 2015. Retrieved 3 April 2017.
  109. ^ "Nuclear only a distant solution for S.Africa". af.reuters.com. Reuters. Archived from the original on 4 April 2017. Retrieved 3 April 2017.
  110. ^ Eskom's capex conundrum
  111. ^ a b "Ramaphosa to oversee Eskom, SAA turnaround". Fin24.
  112. ^ "The story behind Eskom's 'unlawful' Koeberg contract". Fin24. Retrieved 3 April 2017.
  113. ^ "S&P's downgrades South Africa's Eskom further into junk territory". af.reuters.com. Reuters. Archived from the original on 26 November 2016. Retrieved 3 April 2017.
  114. ^ "Matshela Koko takes reins at Eskom as acting CE". Retrieved 3 April 2017.
  115. ^ "Eskom defends SA's nuclear aspirations | IOL". 7 August 2016. Retrieved 3 April 2017.
  116. ^ "South Africa's nuclear plans under reconsideration". Nuclear Engineering International. 1 February 2018. Retrieved 4 February 2018.
  117. ^ Joffe, Hilary (5 March 2018). "No more steep tariff hikes for Eskom". Business Day. Archived from the original on 5 March 2018. Retrieved 6 March 2018.
  118. ^ Laing, Robert (29 March 2018). "Eskom's credit rating blow". Sunday Times. Archived from the original on 29 March 2018. Retrieved 31 March 2018.
  119. ^ "Rating Action: Moody's downgrades Eskom's ratings; maintains negative outlook". Moody's Investors Service. 24 November 2020. Retrieved 17 November 2021.
  120. ^ Hill-Lewis, Geordin. "Geordin Hill-Lewis | Laat wiel! Why wheeling is a crucial step to ending load shedding in CT". Fin24. Retrieved 21 June 2022.
  121. ^ Ngcuka, Victoria O'Regan and Onke; Ngcuka, Victoria O'Regan and Onke (29 June 2022). "POWER CRISIS: How the City of Cape Town managed to avoid Stage 6 load shedding thanks to hydroelectric scheme". Daily Maverick. Retrieved 30 June 2022.