Loeriesfontein Wind Farm
Jump to navigation
Jump to search
Loeriesfontein Wind Energy Facility | |
---|---|
Country | South Africa |
Location | Hantam Municipality |
Coordinates | 30°24′14″S 19°35′20″E / 30.404°S 19.589°ECoordinates: 30°24′14″S 19°35′20″E / 30.404°S 19.589°E |
Status | Commissioned |
Construction began | November 2015 |
Commission date | 2017 |
Owner(s) | Lekela Power Generation Company |
Operator(s) | Mainstream Renewable Power |
Wind farm | |
Type | Onshore |
Power generation | |
Nameplate capacity | 120MW |
Main Sub-Contractors: Siemens Wind Power (Turbines), Concor & Consolidated Power (Construction) |
The Loeriesfontein Wind Energy Facility is a wind farm in the Hantam Municipality, located near Loeriesfontein, in the Northern Cape province of South Africa. Construction began in September 2015 and all the turbines were in place by 28 February 2017. The 140MW Loeriesfontein Wind Farm has a capacity of 535,354 MWh/year.[1]
References
- ^ "news - South African Khobab and Loeriesfontein wind farms begin powering 240 000 homes - FMO". www.fmo.nl. Retrieved 21 August 2022.
Categories:
- Articles with short description
- Short description with empty Wikidata description
- Infobox mapframe without OSM relation ID on Wikidata
- Coordinates not on Wikidata
- Wind farm articles using Infobox power station
- Wind farms in South Africa
- Economy of the Northern Cape
- All stub articles
- Renewable energy stubs
- Pages using the Kartographer extension