Jeffrey’s Bay Wind Energy Facility | |
---|---|
Country | South Africa |
Location | Kouga Local Municipality |
Coordinates | 34°00′S 24°50′E / 34.00°S 24.84°ECoordinates: 34°00′S 24°50′E / 34.00°S 24.84°E |
Status | Commissioned |
Construction began | 2012 |
Commission date | 2014 |
Owner(s) | Globeleq, Mainstream Renewable Power |
Operator(s) | Globeleq, Mainstream Renewable Power |
Wind farm | |
Type | Onshore |
Power generation | |
Nameplate capacity | 138MW |
Main Sub-Contractors: Siemens (Turbines), Concor and Conco (Construction), Actom MV (Switchgear) and Deugro (Transportation) |
The Jeffrey’s Bay Wind Energy Facility is a wind farm in the Kouga Local Municipality, built between Jeffrey’s Bay and Humansdorp, in the Eastern Cape province of South Africa.
History
The 3,700-hectare (14 sq mi) site was chosen for its onshore wind conditions, flat topography and proximity to an existing 132 kV grid. A 20-year power purchase agreement was signed with Eskom as well as an implementation agreement with the Department of Energy. The project was authorized by the Department of Environmental Affairs in 2011.[1] Placement of turbines began in September 2013, and was completed by March 2014.[2][3]
Initial operations started in April 2014. The wind farm supplies 460,000 MWh annually.[4]
References
Categories:
- Articles with short description
- Short description with empty Wikidata description
- Infobox mapframe without OSM relation ID on Wikidata
- Coordinates not on Wikidata
- Wind farm articles using Infobox power station
- Kouga Local Municipality
- Wind farms in South Africa
- Economy of the Eastern Cape
- All stub articles
- Renewable energy stubs
- Pages using the Kartographer extension