Excelsior Wind Farm
Jump to navigation
Jump to search
Excelsior Wind Energy Facility | |
---|---|
Country | South Africa |
Location | Swellendam Local Municipality |
Coordinates | 34°14′31″S 20°13′52″E / 34.242°S 20.231°ECoordinates: 34°14′31″S 20°13′52″E / 34.242°S 20.231°E |
Status | Commissioned |
Construction began | 2018 |
Commission date | 2020 |
Owner(s) | BioTherm Energy |
Operator(s) | Goldwind |
Wind farm | |
Type | Onshore |
Power generation | |
Nameplate capacity | 32,5MW |
Main Sub-Contractors: Concor (Construction) |
The Excelsior Wind Energy Facility is a wind farm in the Swellendam Local Municipality, built 30km southwest of the town of Swellendam, in the Western Cape province of South Africa.
Planning and approval
The project was awarded under the South African Renewable Energy Independent Power Producers Programme (REIPPPP) bid window 4 in 2015 and reached financial close in 2018.[1]
The project comprises 13 Gold Wind 2.5MW permanent magnetic direct drive turbines. The project covers an area of 2,300ha.[2] Excelsior reached commercial operation in December 2020. It can generate 132GWh annually.[3]
References
Categories:
- Articles with short description
- Short description with empty Wikidata description
- Infobox mapframe without OSM relation ID on Wikidata
- Coordinates not on Wikidata
- Wind farm articles using Infobox power station
- Wind farms in South Africa
- Economy of the Eastern Cape
- All stub articles
- Renewable energy stubs
- Pages using the Kartographer extension