West Coast Line (Sweden)

From Justapedia, unleashing the power of collective wisdom
Jump to navigation Jump to search
West Coast Line
Båstad station juli 2010.JPG
Båstad Station
Overview
OwnerSwedish Transport Administration
LocaleSweden
Termini
Service
Operator(s)Swedish Transport Administration
Technical
Line length290 kilometres (180 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Operating speed200 km/h (120 mph)

The West Coast Line (Swedish: Västkustbanan) is a railway line between Gothenburg and Lund,[1] which runs along the West Coast of Sweden. It is electrified all the way, but as of 2021 was still not completed, as the part through Varberg and the part between Helsingborg and Ängelholm are both single-track.
In northern Helsingborg the track follows a 150 year old right of way, which is full of curves that have too small radii, together with a very steep climb.[2] Passing trains must not run faster than 30 km/h during inclement weather. Double track construction takes place between 2020 and 2023.[3]

A doubletrack tunnel under the city of Varberg is under construction since 2019.[4]

References

  1. ^ "Västkustbanan". Nationalencyklopedin (in Swedish). Retrieved 6 September 2010. (subscription required)
  2. ^ Ängelholm–Helsingborg, Romares väg. Trafikverket (swedish) at the Wayback Machine (archived 12 July 2017)
  3. ^ Double tracks between Ängelholm and Helsingborg, Romares väg. Trafikverket, last updated: 2019-06-26
  4. ^ The Varberg tunnel Trafikverket, last updated: 2021-10-14