New Sétif Stadium
This article needs additional citations for verification. (June 2018) |
![]() | |
Location | Ouled Sabor, Sétif, Algeria |
---|---|
Coordinates | 36°10′13.3″N 5°30′48.5″E / 36.170361°N 5.513472°ECoordinates: 36°10′13.3″N 5°30′48.5″E / 36.170361°N 5.513472°E |
Owner | Ministry of Youth and Sport |
Operator | Ministry of Youth and Sport |
Capacity | 50,000 |
Surface | Grass |
Construction | |
Broke ground | TBD |
Opened | TBD |
Construction cost | €295 million |
Builder | ![]() ![]() |
Tenants | |
ES Sétif |
New Sétif Stadium is a 50,000-seat stadium planned in Sétif, Algeria. Construction is currently suspended.
Construction
The new stadium, in Ain Romane on the outskirts of Setif, will meet the "standards" of FIFA for its measurements, lighting, safety, and media. With amenities including a conference room and parking for 6,000 cars, it will cover 75 hectares.
The future stronghold of Black and White will include an Olympic swimming pool, an equestrian center, an athletic stadium with bleachers for 3,000, three replicas courses, a 4-star hotel with 200 beds, a restaurant with 400 seats, a 400-seat auditorium, and a media area. It is expected to itself create hundreds of jobs for the area in tandem with a future industrial mega-area of 700 hectares.
According to local officials, the stadium was to be delivered in 36 months. Construction was contracted to the public company Cosider and the Spanish company Sacyr at a cost of almost 30 billion dinars.[1]
On January 28, 2021 The Minister of Youth and Sports, Sid Ali Khaldi declared that the project of the Olympic sports complex of Sétif frozen since 2015 will be relaunched as soon as the conditions are met, The Minister took this opportunity to review the stages of realization of this project, registered since 2007 with a program authorization of 6 billion DA. In 2009, a Portuguese design office was appointed to provide technical assistance to the project. In February 2010, the operation was reassessed and the program authorization exceeded 15 billion DA. In 2011 and 2012, two national and international calls for tender launched for the selection of a design office were canceled by the tender opening committee due to certain reservations and for non-compliance with the clauses of the specifications.[2]
Tournaments
![]() | This section is empty. You can help by adding to it. (December 2014) |
References
- ^ "Nouveau stade de Sétif : La maquette détaillée dévoilée". DZfoot.com (in French). Retrieved 2018-02-02.
- ^ "Complexe sportif olympique de Sétif: le projet relancé dès que les conditions seront réunies". aps.dz. 28 January 2021. Retrieved 14 July 2022.
- CS1 French-language sources (fr)
- Articles needing additional references from June 2018
- All articles needing additional references
- Infobox mapframe without OSM relation ID on Wikidata
- Coordinates not on Wikidata
- Articles to be expanded from December 2014
- All articles to be expanded
- Articles with empty sections from December 2014
- All articles with empty sections
- Articles using small message boxes
- Football venues in Algeria
- Stadiums under construction
- Buildings and structures in Sétif Province
- All stub articles
- North African sports venue stubs
- Algerian building and structure stubs
- Algerian sport stubs
- Pages using the Kartographer extension