MRT Line 4
Overview
StatusApproved[1][2]
OwnerGovernment of the Philippines
Department of Transportation
Line number4
LocaleMetro Manila and Rizal
Termini
  • N. Domingo
  • Taytay
Stations11 (plus 2 planned future stations)
Service
TypeRapid transit[3]
SystemManila Metro Rail Transit System
Services1
Operator(s)TBA
Depot(s)Excelsior Villas site, Taytay
Rolling stock5-car electric multiple units[3]
Daily ridership234,433 (est.)
History
Planned opening2028
Technical
Line length15.56 km (9.67 mi) (initial)
18.4 km (11.4 mi) (future)
Number of tracksDouble-track[3]
CharacterElevated railway[3][4]
Track gauge1,435 mm (4 ft 8+12 in)[3]
ElectrificationTBD
SignallingCBTC (planned)[3]
Route map

Taytay depot
Taytay
Manila East Road
Tikling
San Juan
Taytay, Rizal
Cainta, Rizal
Mapindan River
Cainta River
Cainta Junction
Cainta, Rizal
 
Buli Creek
 
Pasig
St. Joseph
Rosario
Tiendesitas
Meralco
 MMS 
EDSA
Greenhills Creek
Greenhills
Bonny Serrano
N. Domingo
Lrtalogo.svg

The Metro Rail Transit Line 4, also known as MRT Line 4, is an approved mass rapid transit line to be built in Metro Manila and Rizal in the Philippines.

When completed, it will be the second rapid transit line serving the province of Rizal after the extension of LRT Line 2 to Antipolo, and is expected to significantly reduce the volume of vehicular traffic along Ortigas Avenue and improve connectivity in the eastern parts of the metropolis, including the nearby municipalities in southwestern Rizal.

The proposal, consisting of eleven stations, will be an elevated railway line with a right-of-way alignment along Nicanor Domingo Street, Ortigas Avenue and Taytay Diversion Road,[5] linking suburban Taytay, Rizal to the Ortigas Center business district in eastern Metro Manila.[5]

The project is expected to cost an estimated 59.3 billion or US$1.1 billion.[5][6] According to the Department of Finance, the Philippine government is looking to fund the construction through the Asian Infrastructure Investment Bank and the Asian Development Bank (ADB).[7] A US$1 billion loan from the ADB is expected to be signed in 2023.[4]

Background

History

Ortigas Avenue in 2021.

The first MRT Line 4 project was proposed in 1999 as a line between Recto Avenue, Manila and Batasan Hills, Quezon City. In the late 2010s, the proposed line was renumbered as the MRT Line 8 and the Quezon Memorial Circle–Batasan Hills segment became the MRT Line 7. Meanwhile, the right-of-way for the present Line 4 can be traced to the southeast extension of the LRT Line 2, which would either be an automated guideway transit (AGT) or heavy rail line in the same fashion as the Line 2, as well as a bus rapid transit collector line towards the town of Binangonan in Rizal.[8]

As of 2021, the Ortigas Avenue corridor has an annual average daily traffic of 185,699 vehicles. However, only 9.07 percent of daily traffic comes from public utility vehicles including taxis. An average commute from Tikling in Taytay, Rizal to Ortigas CBD in Pasig City can take up to 3 hours during rush hour. This is the primary motivation to build a rail line in the vicinity to improve journey times between the two areas.[3]

Development

A new LRT Line 4 project,[5] was approved by the Investment Coordination Committee (ICC) of the National Economic and Development Authority in June 2015 as a public–private partnership project,[9] with construction slated to begin in 2017 and a targeted opening date in 2021.[5] However, the initial project was not pushed through until it was approved for a second time on December 20, 2019.[6] The contract for the architectural and engineering design of the project was signed by the Department of Transportation and Spanish design consultant IDOM Consulting Engineering, Architecture, SA on October 1, 2021. Construction is slated to begin by the second quarter of 2022 and targets to be operational by 2028.[10][11][12][13][14]

On October 12, 2022, the Department of Transportation confirmed that the Asian Development Bank (ADB) will extend a loan of US$1 billion for the project, with the signing of the loan expected to take place in 2023.[4]

Construction

Pre-construction activities such as soil testing have already begun in some areas along Ortigas Avenue.[15] Actual construction is expected to begin by the second quarter of 2024 and to be completed by 2027. Full operations shall begin by 2028.[3]

Contract packages

There are five main components in the project. This includes one each for the mainline, station buildings, depot, electromechanical systems and rolling stock.[3]

Route

The MRT-4 will start from Nicanor Domingo Street in Valencia, Quezon City, one block away from Gilmore station of Line 2 in the west, to SM City Taytay in Dolores, Taytay in the east, passing through the cities of Mandaluyong and Pasig and the municipality of Cainta. An empty lot beside the Taytay Municipal Hall and Manila Club East Resort had been reserved for the depot.[16]

The 2019 proposal reduces the line from 18.4 km (11.4 mi) to 15.56 km (9.67 mi) and it will consist of 11 stations, and 2 infill stations that could be built for future demand.[13]

List of stations
Name[17] Distance (km) Structure type Connections Location
Between
stations
Total
Taytay Taytay, Rizal
Manila East Road
Tikling
  •  11  Tikling, Taytay
San Juan[a 1]
(future station)
Cainta, Rizal
Cainta Junction
  •  11  Robinsons Cainta
St. Joseph
  •  11  SM City East Ortigas
Pasig
Rosario
  •  11  Rosario
Tiendesitas
(future station)
  •  11  Frontera Drive
Meralco
EDSA
  •  E  Ortigas
  •  11  Ortigas
Quezon City
Greenhills San Juan
Bonny Serrano
N. Domingo Quezon City

2015 iteration

The first proposal in 2015 involves the construction of 13 elevated stations along Taytay Diversion Road, Ortigas Avenue, ADB Avenue, Shaw Boulevard, P. Sanchez Street, and V. Mapa Street (listed from east to west).

Name Structure Type Transfers Location
Taytay Elevated Taytay, Rizal
L. Wood Elevated Bus interchange  11  Tikling, Taytay
Bonifacio Avenue Elevated Bus interchange  11  Robinsons Cainta Cainta, Rizal
Pasig Elevated Bus interchange  11  Rosario Pasig
Meralco Elevated Bus interchange  11  The Medical City Ortigas
Julia Vargas Elevated Mandaluyong/Pasig
Lourdes Elevated Bus interchange  12  Sheridan
EDSA Elevated Metro interchange 3 Ortigas

Bus interchange  11  Ortigas
Mandaluyong
Wack Wack Elevated
Acacia Lane Elevated
Kalentong Depressed Bus interchange  12  Kalentong
Dupil Depressed Manila
Magsaysay Boulevard Depressed Metro interchange Lrtalogo.svg V. Mapa

Bus interchange  10  V. Mapa

Alignment between Ortigas Center and LRT-2

The line is a component of the Manila East Rail Transit Project proposed by the Japanese government in February 2015 which aims to provide a medium-capacity rail transport system connecting central and eastern Metro Manila with the province of Rizal.[16] Its proposed alignment is along Ortigas Avenue with an option to extend the line to as far east as the Rizal municipality of Angono on the Manila East Road, and west to either of the following terminals:

Option 2 was the chosen alignment of the study owing to its capability to serve the most demand that can alleviate traffic the most on the Taytay-Cainta-Pasig-Mandaluyong-Manila corridor. Construction did not push through despite receiving approval by President Benigno Aquino III last September 2015.[18]

Design

The line will be a generally elevated mass rapid transit (MRT) railway with two tracks.[3]

Originally approved as a heavy monorail line in its LRT Line 4 iteration, the project's Environmental Impact Study (EIS) published in September 2022 presented the possible options of constructing the line as a monorail, a light rail transit, or as a "mass rapid transit" (MRT) system.[3] Of the three options, the MRT option was strongly recommended by IDOM due to ease of maintenance and abundance of technical suppliers. In addition to this, studies conducted by IDOM also determined that the ridership demand along the San Juan-Rizal corridor was higher than expected. Because of this, the recommendation to use a MRT system was accepted by the Department of Transportation later that month.[4]

The guideway will use three different girder designs for the elevated sections: segmental box, precast concrete U-type and dapped-end girders. However, the design of the box girders will be different to that of the North–South Commuter Railway, having a more rounded U shape than that of the boxier design of the NSCR girders.[3]

The line is expected to have a headway of 4 minutes, and can be further lessened to 2 minutes with the introduction of CBTC signaling.[3]

Stations

The stations are divided into two types: the narrow-width and the standard-width stations. For both types, the platform length is consistently 120 meters (390 ft) long. These will also have three levels with one each for ground access, concourse and platforms to be built on top of center islands. The narrow width stations are 17 meters (56 ft) wide and instead of having its own ground level entries, it will utilize neighboring commercial structures to access the concourse. The standard-width types are 28 meters (92 ft) wide and will have its own dedicated ground-level entrance.[3]

EDSA station will have its own design, being 150 meters (490 ft) long and will have 2 different concourses.

Rolling stock

The line will initially use 5-car electric multiple unit trains. The stations are also designed for an expansion to 6 cars. The car length for each train is 20 meters (66 ft) including couplers, which would mean a total length of 100 meters (330 ft) for the initial 5-car trains and 120 meters (390 ft) for the 6-car trains. A 5-car train is capable of carrying 1,000 passengers. To achieve the 4-minute headway target, up to 35 trainsets shall be ordered which corresponds to the number of rolling stock operators in the operations stage.[3]

The electrification system remains unknown as of September 2022.

Depot

The EIS report recommends the construction of the depot at the former Excelsior Villas site in Taytay, Rizal. It is located at the Rizal end of the line near the municipal hall. Other options include a vacant lot beside SM Taytay and at the Comeco compound in Pasig. The other two sites were put as secondary alternative locations to the Excelsior site as these require additional land acquisition. The Comeco location would also need a significant realignment in the right-of-way.[3]

The depot is expected to have a 24-hour operation and will have stabling facilities, stabling track, traverser system, train storage, workshops and substation facilities.

Notes

  1. ^ Not to be mistaken for San Juan City in Metro Manila. Station is proposed to be located in San Juan, Antipolo near the Valley Golf Country Club.

References

  1. ^ Dela Paz, Chrisee (July 21, 2015). "NEDA body approves NAIA and Line 4 PPP projects". Rappler.
  2. ^ "MRT Line 4 Status". Electronic Freedom of Information Philippines. April 15, 2020. Retrieved July 11, 2020.
  3. ^ a b c d e f g h i j k l m n o p PROJECT DESCRIPTION FOR SCOPING (PDF). Manila MRT L4 (Report). September 2022. Retrieved October 6, 2022.
  4. ^ a b c d Rosales, Elijah Felice (October 11, 2022). "ADB to lend $1 billion for MRT 4". The Philippine Star. Retrieved October 12, 2022.
  5. ^ a b c d e "LRT Line 4 Project" (PDF). Public–Private Partnership Center. Retrieved October 1, 2021.
  6. ^ a b "Cabinet-level body approves ₱59.3-billion MRT-4 project". CNN Philippines. December 31, 2019. Retrieved January 5, 2020.
  7. ^ Vera, Ben O. de (September 26, 2019). "PH eyes MRT 4 funding help from China-based institution". Inquirer.net. Retrieved January 5, 2020.
  8. ^ METRO MANILA URBAN TRANSPORTATION INTEGRATION STUDY: Final Report Summary (PDF) (Report). Japan International Cooperation Agency. March 5, 1999. Retrieved October 2, 2021.
  9. ^ "Major infrastructure projects lined up". BusinessWorld. June 15, 2015. Retrieved July 5, 2015.
  10. ^ Camus, Miguel (October 4, 2021). "DOTr reveals MRT 4 will be a monorail project, targets full operations by 2028". Philippine Daily Inquirer. Retrieved October 14, 2021.
  11. ^ Mercurio, Richmond (October 1, 2021). "P1.4 billion MRT consultancy contract signed today". The Philippine Star. Retrieved October 1, 2021.
  12. ^ Amojelar, Darwin G. (December 31, 2019). "Cabinet committee clears P59.3-b MRT Line 4 project". Manila Standard. Retrieved January 5, 2020.
  13. ^ a b Cordero, Ted (December 31, 2019). "DOTr gets ICC greenlight for P59.3B MRT-4 project". GMA News Online. Retrieved January 5, 2020.
  14. ^ Subingsubing, Krixia (January 10, 2020). "MRT 4 project targeted for completion in 2025". Inquirer.net.
  15. ^ TRAFFIC SA ORTIGAS AVE ! TATAPOSIN NA ! MRT 4 Soil Testing umabot na sa Taytay Rizal [Traffic will end in Ortigas Ave.! MRT 4 Soil testing has reached Taytay, Rizal]. September 2022. Retrieved October 8, 2022.
  16. ^ a b "Study on Medium Capacity Transit System Project in Metro Manila, The Republic of The Philippines" (PDF). Ministry of Economy, Trade and Industry (Japan). February 2015. Archived from the original (PDF) on July 12, 2018. Retrieved July 9, 2015.
  17. ^ Soho, Jessica (Host) (January 3, 2020). SONA: Pagtatayo ng MRT-4 na tatagos sa kahabaan ng Ortigas Ave., inaprubahan ng NEDA Board [NEDA board approved the construction of MRT-4 that will run through Ortigas Ave.]. www.youtube.com (in Filipino). GMA News.
  18. ^ Gappi, Richard R. (September 6, 2015). "SM Taytay-EDSA Line 4, inaprubahan na ni P-Noy at ng NEDA" [SM Taytay-EDSA LRT 4, approved by P-Noy and NEDA] (in Filipino). Archived from the original on November 4, 2016.