List of power stations in Ohio

From Justapedia, unleashing the power of collective wisdom
Jump to navigation Jump to search

Sources of Ohio utility-scale electricity generation:
full-year 2021[1]

  Coal (37.1%)
  Natural Gas (43.9%)
  Hydroelectric (0.3%)
  Wind (2.1%)
  Nuclear (14.2%)
  Biomass (0.5%)
  Solar (0.5%)
  Petroleum (0.8%)
  Other (0.6%)

This is a list of electricity-generating power stations in the U.S. state of Ohio, sorted by type and name. In 2019, Ohio had a total summer capacity of 28,464 MW and a net generation of 120,001 MWh.[2] The corresponding electrical energy generation mix was 43.3% natural gas, 39.6% coal and petroleum coke, 14.3% nuclear, 1.7% wind, 0.6% biomass, 0.3% hydroelectric, 0.1% solar, and 0.1% petroleum.[1]

Natural Gas

Name Location Capacity (MW) Owner Type Notes and Links
Hanging Rock Energy Facility Hanging Rock 1430 Dynegy Natural Gas Combined Cycle [3]
Lordstown Energy Center Lordstown 940 Clean Energy Future, LLC Natural Gas Combined Cycle Opened in 2018, Second Unit Planned[4]
Oregon Clean Energy Center Oregon 908 Ares Management Natural Gas Combined Cycle Opened in 2017
Rolling Hills Generating Station Wilkesville 865 Rolling Hills Generating LLC Natural Gas Simple Cycle (5 units)
Waterford Energy Center Waterford 821 Waterford Power, LLC Natural Gas Combined Cycle
Carroll County Energy Carrollton 700 Advanced Power Natural Gas Combined Cycle Opened in 2018[5]
Washington Energy Facility Beverly 620 Dynegy Natural Gas Combined Cycle
Darby Generating Station Mount Sterling 480 Darby Power, LLC Natural Gas Simple Cycle
Middletown Energy Center Middletown 475 NTE Energy Natural Gas Combined Cycle Opened in 2018
West Lorain Plant Lorain 545 Starwood Energy Natural Gas Simple Cycle
Robert P Mone Plant Convoy 510 Buckeye Power Natural Gas Simple Cycle
Fremont Energy Center Fremont 707 American Municipal Power Natural Gas Combined Cycle
Dresden Plant Dresden 580 American Electric Power Natural Gas Combined Cycle Opened in 2012
Madison Peaking Station Trenton 677 Dynegy Natural Gas Simple Cycle
Long Ridge Energy Terminal Hannibal 485 Long Ridge Energy Hydrogen - Natural Gas Blend Opened in 2021 [6]

Coal

Name Location Capacity (MW) Owner Type Notes and Links
Bay Shore Oregon 150 Walleye Energy LLC Petroleum Coke (1 unit) Opened in 1955.[7]
Cardinal Power Plant Brilliant 1800 American Electric Power (AEP)/Buckeye Power Coal (3 units) To be converted to natural gas by 2030.[8]
Gavin Power Plant Cheshire 2640 Gavin Power, LLC Coal (2 units) [9] Only runs 60% of the time. Up to 50% of Gavin’s cash flow comes from being on standby for emergency power[10]
Kyger Creek Power Plant Cheshire 1086 Ohio Valley Electric Corporation Coal (5 units) [11] Subsidized by the controversial HB6 Bill until 2030 [12]
Miami Fort Power Station North Bend 1020 Vistra Corp Coal (2 units) Older units shut down in 2015. Planned retirement by year-end 2027 or earlier.[13][14]
Toledo Refining Power Recovery Oregon 6.0 Toledo Refining Co. Petroleum Coke (1 unit) Opened in 1986.[15]
W. H. Sammis Power Plant Stratton 1500 Energy Harbor Coal (3 units) Units 1-4 shut down in May 2020.[16] Units 5-7 are to be closed or sold by June 2023.[17]

Nuclear

Name Location Capacity (MW) Owner Type Notes and Links
Perry Nuclear Generating Station North Perry 1231 Energy Harbor Nuclear boiling water reactor (1 unit)
Davis-Besse Nuclear Power Station Oak Harbor 960 Energy Harbor Nuclear Pressurized water reactor (1 unit)

Wind

Name Location Capacity (MW) Owner Type Notes and Links
AMP Wind Farm Wood County 7.2 American Municipal Power[18] Wind power
Blue Creek Wind Farm Paulding and Van Wert Counties 304 Iberdrola Renewables 160 Wind Turbines Operational.[19]
Timber Road Wind Farm Paulding County 362.7 EDP Renewables 158 Wind Turbines Operational.[19]
Hog Creek Hardin County 66 30 Wind Turbines Operational.[19]
Northwest Ohio Paulding County 100 42 Wind Turbines Operational.[19]
Scioto Ridge Hardin County & Logan County 249.8 Innogy 75 Wind Turbines Operational.[19]
Icebreaker Cuyahoga County 20.7 6 Wind Turbines Approved for Construction.[19]
Emerson Creek Hardin County & Erie County 297.7 71 Wind Turbines Approved for Construction.[19]

Solar

Name Location Capacity (MW) Owner Type Notes and Links
Bowling Green Solar Facility Bowling Green 20 NextEra Solar photovoltaic (85,680 panels) [20]
Napoleon Solar Facility Napoleon 3.54 American Municipal Power Solar photovoltaic [20]
Wadsworth Rittman Rd. Facility Wadsworth 2.625 American Municipal Power Solar photovoltaic [20]
Wadsworth Seville Rd. Facility Wadsworth 6.25 American Municipal Power Solar photovoltaic [20]
Wyandot Solar Facility Upper Sandusky 12 Public Service Enterprise Group Solar photovoltaic (160,000 panels) Opened in 2010.
Hardin I Hardin County 150 Solar photovoltaic Operational.[21]
Hillcrest Brown County 200 Solar photovoltaic Operational.[21]
New Market Highland County 100 Solar photovoltaic Operational.[21]
Hardin II Hardin County 170 Solar photovoltaic Under Construction.[21]
Operational in Q2 2023.[22]
Yellowbud Pickaway & Ross County 274 Solar photovoltaic Under Construction.[21]
Operational Dec 2022.[23]
Willowbrook I Brown County 150 Solar photovoltaic Under Construction.[21]
Operational Dec 2022.[24]
Nestlewood Brown County 80 Solar photovoltaic Under Construction.[21]
Big Plain Madison County 196 Solar photovoltaic Under Construction.[21]
Operational June 2023.[25]
Arche Fulton County 107 Solar photovoltaic Under Construction.[21]
Operational in early 2023.[26]
Hardin III Hardin County 300 Solar photovoltaic Under Construction.[21]
Operational in 2023.[27]
AEUG Union Union County 325 Solar photovoltaic Under Construction.[21]
Operational in 2023.[28]
Highland Highland County 300 Solar photovoltaic Under Construction.[21]
Fox Squirrel Madison County 577 Solar photovoltaic Under Construction.[21]
Operational in Q4 2024.[29]
Atlanta Farms Pickaway County 200 Solar photovoltaic Approved for Construction.[21]
Vinton Vinton County 125 Solar photovoltaic Approved for Construction.[21]
Madison Fields Madison County 180 Solar photovoltaic Approved for Construction.[21]
Alamo Preble County 69.9 Solar photovoltaic Approved for Construction.[21]
Angelina Preble County 80 Solar photovoltaic Approved for Construction.[21]
Powell Creek Putnam County 150 Solar photovoltaic Approved for Construction.[21]
Wheatsborough Erie County 125 Solar photovoltaic Approved for Construction.[21]
Mark Center Defiance County 110 Solar photovoltaic Approved for Construction.[21]
Clearview Champaign County 144 Solar photovoltaic Approved for Construction.[21]
Ross County Ross County 120 Solar photovoltaic Approved for Construction.[21]
Cadence Union County 275 Solar photovoltaic Approved for Construction.[21]
Juliet Wood County 101 Solar photovoltaic Approved for Construction.[21]
Sycamore Creek Crawford County 117 Solar photovoltaic Approved for Construction.[21]
Marion County Marion County 100 Solar photovoltaic Approved for Construction.[21]
Union Ridge Licking County 107.7 Solar photovoltaic Approved for Construction.[21]
Tymochtee Wyandot County 120 Solar photovoltaic Approved for Construction.[21]
Nottingham Harrison County 100 Solar photovoltaic Approved for Construction.[21]
Wild Grains Van Wert County 150 Solar photovoltaic Approved for Construction.[21]

|- |Dodson Creek |Highland County |117 | |Solar photovoltaic |Approved for Construction.[21] |} |- |Pleasant Prairie |Franklin County |250 | |Solar photovoltaic |Approved for Construction.[21] |} |- |Harvey |Licking County |350 | |Solar photovoltaic |Approved for Construction.[21] |}

Hydroelectricity

Name Location Capacity (MW) Owner Type Notes and Links
O'Shaughnessy Dam Dublin 5.2 City of Columbus Hydroelectricity [30] Offline as of August 2018. It is unknown when or if it will be fixed.
Hamilton Hydro Hamilton 2 City of Hamilton Hydroelectricity [30]
Auglaize Hydroelectric Plant Bryan 4.5 City of Bryan Hydroelectricity [30]
Captain Anthony Meldahl Locks and Dam Felicity 105 American Municipal Power Hydroelectricity [30] Largest hydroelectric plant on the Ohio river and is located on Kentucky side of the Ohio River. The City of Hamilton retains 51.4% of the power generation[31]
Greenup Lock and Dam Franklin Furnace 70.2 American Municipal Power Hydroelectricity [30]
Racine Lock and Dam Racine 20 AEP Hydroelectricity [30]
Belleville Lock and Dam Reedsville 42 American Municipal Power Hydroelectricity [30] Hydroelectric plant is located on West Virginia side of the Ohio River.
Willow Island Lock and Dam Newport 44 American Municipal Power Hydroelectricity [30] Hydroelectric plant is located on West Virginia side of the Ohio River.
Hannibal Locks and Dam Hannibal 19 New Martinsville Hannibal Hydro Hydroelectricity [30] Hydroelectric plant is located on West Virginia side of the Ohio River.

Battery Storage

Name Location Capacity (MW) Owner Type Notes and Links
Battery Utility of Ohio Sunbury 4 Battery Utility of Ohio Battery [30]
AEP Bluffton NaS Bluffton 2 Ohio Power Co Battery [30]
HMV Minster Energy Storage System Minster 7 Half Moon Ventures LLC Battery [30]
Willey Battery Utility Hamilton 6 Willey Battery Utility Battery [30]
Clinton Battery Blanchester 10 Clinton Battery Utility Battery [30]
Beckjord Power Station New Richmond 4 Duke Energy Battery [30]

Closed plants

Name Location Capacity (MW) Owner Type Notes and Links
Ashtabula Power Plant Ashtabula 244 FirstEnergy Coal Closed in 2015[32]
W.C. Beckjord Power Station New Richmond 1304 Duke Energy, DPL Inc., AEP Coal (6 units) Closed in 2014[33][34]
R.E. Burger Power Station Shadyside 568 FirstEnergy Coal Closed in 2011
Conesville Power Plant Conesville 2005 AEP, AES/DPL Inc. 6 units: coal & oil Units 5-6 shut down in 2019 and Unit 4 closed in 2020.[3]
Eastlake Power Plant Eastlake 1257 FirstEnergy Coal (units 1-5) / Natural Gas (unit 6) Units 4-5 closed 2012, Units 1-3 closed in 2015, Unit 6 closed 2021.[32]
O.H. Hutchings Station Miamisburg 414 DPL Inc. Coal Closed in 2013[35]
Richard H. Gorsuch Station Marietta 200 American Municipal Power Coal Built by Union Carbide in 1951 as Marietta Steam Plant, sold to American Municipal Power in 1988 and renamed to Richard H. Gorsuch, closed in 2012.
Killen Station Wrightsville 618 AES/DPL Inc., Dynegy Coal (1 unit) Sold to AES 2012[3] Closed in 2018.
Lake Shore Power Plant Cleveland 245 FirstEnergy Coal Closed in 2015[32]and demolished in 2017.[36]
Muskingum River Power Plant Beverly 1375 American Electric Power Coal (5 units) Closed in 2015[37]
Philo Power Plant Philo 510 Ohio Power Coal Closed in 1975; Philo Unit 6 was the first commercial supercritical steam-electric generating unit in the world,[38] and it could operate short-term at ultra-supercritical levels.[39]
Picway Power Plant Lockbourne 220 AEP Coal Closed in 2015
E.M. Poston Power Plant Nelsonville AEP Coal Closed in 1987
Shelby Municipal Light Plant Shelby 37 City of Shelby Coal (4 units) Closed in 2013, power monitoring remains[40]
Sidney Waterworks and Electric Light Building Sidney City of Sidney Hydroelectric (1 unit) Began generation in 1900[41]
J.M. Stuart Station Aberdeen 2318 AES/DPL Inc., Dynegy, and AEP Coal (4 units) Sold to AES 2012[3] Closed in 2018.
Tait Power Station Dayton 586 DPL Inc. Natural Gas/Oil Closed 2013
Tidd Plant Brilliant 220 Ohio Power Coal Retired in 1976. Was used as a demonstration for pressurized fluidized bed combustion (PFBC) for four years from 1991–1995.
Toronto Power Plant Toronto Ohio Edison Coal Closed in 1993
Trash Burning Power Plant Columbus SWACO Waste-to-energy Closed in 1994
Avon Lake Power Station Avon Lake 680 NRG Energy Coal Closed in 2022.[42]
William H. Zimmer Power Station Moscow 1300 Vistra Corp Coal Closed in May 2022.[13]

See also

References

  1. ^ a b "Electricity Data Browser, Net generation for all sectors, Ohio, Fuel Type-Check all, Annual, 2001–21". www.eia.gov. Retrieved 2022-03-15.
  2. ^ "Ohio Electricity Profile". U.S. Energy Information Administration. Retrieved 2021-08-11.
  3. ^ a b c d "Dynegy Generating Facilities 2016" (PDF). Dynegy. Archived from the original (PDF) on 2017-02-04. Retrieved 2017-02-03.
  4. ^ "Lordstown Energy Center". Retrieved 2019-04-25.
  5. ^ Power, Advanced. "Carroll County Energy Begins Commercial Operations". www.prnewswire.com. Retrieved 2018-05-31.
  6. ^ "Long Ridge Energy Terminal". Long Ridge Energy.
  7. ^ "Bay Shore Plant". Global Energy Monitor. Retrieved 2021-08-12.
  8. ^ "Buckeye Power - Ohio Rural Electric Cooperative - About Us 2012". Archived from the original on 2012-10-22. Retrieved 2012-08-15.
  9. ^ State Electricity Profiles 2010 - 317 pages released January 2012 (PDF) (Report). U.S. Energy Information Administration - Dept. of Energy.
  10. ^ McLaughlin, Tim (2 March 2021). "How private equity squeezes cash from the dying U.S. Coal industry". Reuters.
  11. ^ "Ovec-Ikec".
  12. ^ "Ohio consumer watchdog asks regulators to revisit coal plant bailouts". 13 July 2021.
  13. ^ a b "Coal power plant in Greater Cincinnati that employs 150 to close earlier than expected". July 19, 2021. Retrieved July 21, 2021.
  14. ^ "Locations". dynegy.com. Retrieved 2018-05-31.
  15. ^ Energy Information Administration (15 September 2020). "Form EIA-860 detailed data with previous form data (EIA-860A/860B)". eia.gov. Archived from the original on 18 September 2020.
  16. ^ "W. H. Sammis Plant". www.firstenergycorp.com. 28 June 2011. Archived from the original on 2013-04-07.
  17. ^ "Ohio's Sammis coal plant, saved by House Bill 6, will close or be sold by 2023, owner says". 15 Mar 2022.
  18. ^ "Wind Power". www.amppartners.org. Retrieved 2020-11-23.
  19. ^ a b c d e f g "Wind Status as of 9/17/2021" (PDF). Ohio Power Siting Board. Retrieved 2021-09-20.
  20. ^ a b c d "Solar Power". www.amppartners.org. Retrieved 2020-11-23.
  21. ^ a b c d e f g h i j k l m n o p q r s t u v w x y z aa ab ac ad ae af ag ah "Solar Status as of 8/2/2022" (PDF). Ohio Power Siting Board.
  22. ^ "Hardin Solar II Energy Center".
  23. ^ "Yellowbud Solar Project".
  24. ^ "Willowbrook Solar Farm".
  25. ^ "Leeward begins construction of Big Plain Solar project in Ohio".
  26. ^ "Archer Solar".
  27. ^ "Hardin Solar III Energy Center".
  28. ^ "Union County Solar Farm".
  29. ^ "About the Project".
  30. ^ a b c d e f g h i j k l m n o "Ohio - State Energy Profile Overview - U.S. Energy Information Administration (EIA)". www.eia.gov. Retrieved 3 June 2020.
  31. ^ "Meldahl Hydro Project". www.amppartners.org. Retrieved 3 June 2020.
  32. ^ a b c "FirstEnergy closes 104-year-old coal power plant, electric rates to rise (interactive map)". 15 April 2015. Retrieved 16 April 2018.
  33. ^ "W C Beckjord Station - Power Plants - Duke Energy". Duke Energy. Retrieved 16 April 2018.
  34. ^ "Beckjord Station (Coal)". Duke Energy. Archived from the original on 2008-07-19. Retrieved 2008-07-14.
  35. ^ Levingston, Chelsey (March 8, 2014). "Potential for six power plants to operate in Butler County". Journal-News. Retrieved April 19, 2018.
  36. ^ Funk, John (23 February 2017). "Lake Shore Plant's final demolition was overnight (vintage photos)". The Plain Dealer. Retrieved 27 April 2022 – via Cleveland.com.
  37. ^ "AEP Muskingum River plant closure hitting 62 jobs - Columbus - Columbus Business First". Archived from the original on 2015-05-24.
  38. ^ "Philo 6 Steam-Electric Generating Unit". ASME. Retrieved 12 February 2018.
  39. ^ "First U.S. Ultrasupercritical Power Plant in Operation". POWER Magazine. 2013-02-01. Retrieved 2018-02-12.
  40. ^ Graphics, Lantz Star. "Electricity & Communication Department". shelbycity.oh.gov. Retrieved 2018-05-13.
  41. ^ Owen, Lorrie K., ed. Dictionary of Ohio Historic Places. Vol. 2. St. Clair Shores: Somerset, 1999, 1275.
  42. ^ "Sale to developer pulls plug on Avon Lake Power Plant". 19 July 2021.