Line 2 (Qingdao Metro)

From Justapedia, unleashing the power of collective wisdom
Jump to navigation Jump to search
Line 2
QM L2 icon.svg
李村公园站站台.jpg
Licun Gongyuan (now Licun Park) station Line 2 platform
Overview
StatusIn operation
OwnerGovernment of Qingdao
LocaleQingdao, China
Termini
Stations21
Service
TypeRapid transit
SystemQingdao Metro
Services1
Operator(s)Qingdao Metro Corporation
Rolling stockChinese Type B1
History
Opened10 December 2017; 6 years ago (2017-12-10)
Technical
Line length24.387 km (15.15 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

Line 2 of Qingdao Metro (Chinese: 青岛地铁2号线) is an underground metro line in Qingdao.

History

The eastern section was opened on 10 December 2017 with 18 stations from Zhiquan Road to Licun Park.[1]

The western section from Zhiquan Road station to Taishan Road station opened on December 16, 2019. Haixin Bridge station on the section is not opened.[2]

Opening timeline

Segment Commencement Length Station(s) Name
Zhiquan Road — Licun Park 10 December 2017 20.422 km (12.69 mi) 18 Phase 1 (Eastern section)
Taishan Road — Zhiquan Road 16 December 2019 4.2 km (2.61 mi)[3] 3[a] Phase 1 (Western section)
Ferry Terminal — Taishan Road 30 September 2023 4 Phase 1 (Western section extension)

Stations

Station name Connections Distance
km
Location
English Chinese
Ferry Terminal 轮渡 Shinan
Xiaogang 小港 Shibei
International Cruise Port 国际游轮港
Taishan Road 泰山路  4  0.000 0.000
Lijin Road 利津路  4   5  1.220 1.220
Taidong 台东  1  0.769 1.989
Haixin Bridge[a] 海信桥 1.104 3.093
Zhiquan Road 芝泉路 0.872 3.965 Shinan
May 4th Square 五四广场  3   8  1.555 5.520
Fushansuo 浮山所 0.928 6.448
Yan'erdao Road 燕儿岛路  7  1.038 7.486
Gaoxiong Road 高雄路 0.802 8.288
Maidao 麦岛  5  1.160 9.448 Shinan / Laoshan
Haiyou Road 海游路 1.156 10.604 Laoshan
Haichuan Road 海川路 1.005 11.609
Hai'an Road 海安路 1.225 12.834
Shilaoren Beach 石老人浴场  5  1.547 14.381
Miaoling Road 苗岭路  11  1.043 15.424
Tong'an Road 同安路 1.496 16.920
Liaoyang East Road 辽阳东路  4  0.815 17.735
Donghan 东韩 1.483 19.218
Hualoushan Road 华楼山路 2.255 21.473 Licang
Zaoshan Road 枣山路 0.906 22.379
Licun 李村  3  1.071 23.450
Licun Park 李村公园 0.937 24.387
  1. ^ a b Haixin Bridge station is not opened.

Future Development

A 3.84 km (2.39 mi) extension from Taishan Road to Lundu (Ferry Terminal) started construction on October 26, 2019.[4]

References

  1. ^ "地铁2号线(东段)12月10日开通试运营". Qingdao Metro. Qingdao Metro. Retrieved 18 December 2017.
  2. ^ "定了!地铁2号线西段将于12月16日通车". 2019-12-13.
  3. ^ "青岛地铁2号线西段轨通,年底全线通车". 2019-04-30.
  4. ^ "青岛地铁2号线延长段开工 长3.84千米设3个站点". 2019-10-26.