Huron Wind
Jump to navigation
Jump to search
Huron Wind wind farm | |
---|---|
![]() Huron Wind wind farm | |
![]() | |
Country | Canada |
Location | Inverhuron, Ontario near Tiverton |
Coordinates | 44°18′58″N 81°32′55″W / 44.315988°N 81.548595°WCoordinates: 44°18′58″N 81°32′55″W / 44.315988°N 81.548595°W |
Status | Operational |
Construction began | July 11, 2002 |
Commission date | December 1, 2002 |
Owner(s) | BPC Generation Infrastructure Trust, Cameco Corporation and TransCanada PipeLines Limited |
Power generation | |
Nameplate capacity | 9 megawatt (MW) |
Capacity factor | 29.9% |
External links | |
Website | www |
Huron Wind is the first commercial wind farm in Ontario. It is located in the village of Inverhuron, Ontario near Tiverton, and consists of 5 Vestas V80-1.8MW wind turbines.[1] It is next to the Bruce Power Visitor Centre, within sight of the Bruce Nuclear Generating Station, and adjacent to the larger Enbridge Ontario Wind Farm. Groundbreaking was on July 11, 2002, and it was declared officially in service on December 1, 2002.
The project is owned by a consortium of BPC Generation Infrastructure Trust, Cameco Corporation and TransCanada PipeLines Limited.
See also
References
- ^ "Huron Wind Fact File" (PDF). Huron Wind. Retrieved 2009-09-22.[dead link]
External links
Categories:
- All articles with dead external links
- Articles with dead external links from May 2016
- Infobox mapframe without OSM relation ID on Wikidata
- Coordinates not on Wikidata
- Buildings and structures in Bruce County
- Wind farms in Ontario
- All stub articles
- Wind farm stubs
- Canadian power station stubs
- Pages using the Kartographer extension