Coastal corridor

From Justapedia, unleashing the power of collective wisdom
Jump to navigation Jump to search
Coastal corridor
沿海通道
Overview
StatusPartly operational
LocalePeople's Republic of China
Termini
Service
TypeHigh-speed rail
Operator(s)China Railway High-speed
Technical
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25 kV AC
Operating speed200 to 350 km/h (124 to 217 mph)

The Coastal corridor is a high-speed rail corridor running along the eastern coast of China, stretching from Dalian in the north to Fangchenggang in the south and passing through the cities of Shenyang, Qinhuangdao, Tianjin, Dongying, Weifang, Qingdao, Lianyungang, Yancheng, Nantong, Shanghai, Ningbo. Fuzhou, Xiamen, Shenzhen, and Zhanjiang.[1] The Weifang–Qingdao stretch splits into two, one directly connecting Weifang to Qingdao, the other connecting Weifang to Qingdao through Yantai. Announced in 2016 as part of the national "eight vertical and eight horizontal" high-speed railway network as an expanded Hangzhou–Fuzhou–Shenzhen passenger railway from the "four vertical and four horizontal" plan.[2] The line will comprise a mixture of high-speed railway lines, upgraded conventional rail lines and intercity railways.

Route

Section
Railway line
Description Designed
speed
(km/h)

Length
(km)

Construction
start date

Open date
Dandong–Dalian
intercity railway
Intercity railway connecting Dandong and Dalian. 200 296 17 March 2010 17 December 2015
Dalian–Shenyang
Harbin–Dalian high-speed railway (section)
HSR from Dalian to Shenyang. Part of larger rail line from Harbin to Dalian. 350 904 23 August 2007 1 December 2012[3]
Shenyang–Qinghuangdao
Qinghuangdao–Shenyang high-speed railway
PDL connecting Qinhuangdao & Shenyang. Now part of Jingha Railway. 250 404 16 August 1999 12 October 2003
Qinghuangdao–Binhai
Tianjin–Qinhuangdao high-speed railway (section)
HSR from Qinhuangdao to Binhai. Part of larger rail line from Qinhuangdao to Tianjin. 350 261 8 November 2008 1 December 2013
Binhai–Weifang
Tianjin–Weifang–Yantai high-speed railway (section)
Proposed railway line linking Binhai to Weifang. Currently under EIA analyzing. Also part of Jinghu corridor east route. 350 (expected) 354 2022 (expected) 2025 (expected)
Weifang–Qingdao
Jinan–Qingdao second high-speed railway (section)
Connecting Weifang and Qingdao, part of a larger railway line connecting Jinan and Qingdao. 350 308 11 August 2015 26 December 2018
Qingdao–Yancheng Class I high-speed railway between Qingdao and Yancheng. 200 429 26 December 2010 26 December 2018
Yancheng–Nantong high-speed railway HSR connecting Yancheng and Nantong. 350 157 16 January 2018 29 December 2020
Nantong–Shanghai
Shanghai–Suzhou–Nantong railway
Railway between Nantong and Shanghai. 200 137 1 March 2014 1 July 2020
Shanghai–Hangzhou
high-speed railway
HSR connecting Shanghai Hongqiao & Hangzhou East. 350 150 26 February 2009 26 October 2010
Hangzhou–Shaoxing
Hangzhou–Ningbo high-speed railway (section)
HSR from Hangzhou to Shaoxing. 350 152 19 March 2009 1 July 2013
Shaoxing–Wenling
Hangzhou–Taizhou high-speed railway (section)
HSR from Shaoxing to Wenling. 350 226 23 December 2006 8 January 2022
Wenling–Fuzhou
Ningbo–Taizhou–Wenzhou–Fuzhou high-speed railway
Planned PDL along the coast from Wenling to Fuzhou. Services currently using the older Wenzhou–Fuzhou mixed passenger & freight HSR line TBD 314[4] TBA
Fuzhou–Xiamen[5]
high-speed railway
Under construction PDL along the coast of Fujian from Fuzhou to Xiamen via Putian & Quanzhou and terminating at Zhangzhou. Services currently using the older Fuzhou–Xiamen mixed passenger & freight HSR line 350 278[6] 15 January 2017[7] 30 September 2022[6]
Zhangzhou–Shantou

Zhangzhou–Shantou high-speed railway

Planned PDL along the coast from Fuzhou to Shantou. Services currently using the older Xiamen–Shenzhen railway mixed passenger & freight HSR line 350 181[8] TBA TBA
Shantou–Shanwei

Shantou–Shanwei high-speed railway

Under construction PDL along the coast of Guangzhou from Shantou to Shanwei. Services currently using the older Xiamen–Shenzhen railway mixed passenger & freight HSR line 350 162 2018-12-26 2023
Guangzhou–Shanwei

Guangzhou–Shanwei high-speed railway

Under construction branch PDL to Guangzhou bypassing Shenzhen. 350 242 2017-07-05 2023
Shenzhen–Maoming 200 387 2014-6-28 2018-7-1

(partially open)

Maoming–Zhanjiang 200 103 2009-3-21 2013-12-28
Zhanjiang–Hepu
Hepu–Zhanjiang Railway
Railway line connecting Zhanjiang and Hepu County.
Hepu–Qinzhou
Qinzhou–Beihai high-speed railway
Between Qinzhou and Beihai.
Qinzhou–Fangchenggang
Qinzhou–Fangchenggang railway
Between Qinzhou and Fangchenggang.

parallel old sections

Section
Railway line
Description Designed
speed
(km/h)

Length
(km)

Construction
start date

Open date
Hangzhou–Ningbo
Hangzhou–Ningbo high-speed railway
HSR from Hangzhou to Ningbo. 350 152 19 March 2009 1 July 2013
Ningbo–Wenzhou

Ningbo–Taizhou–Wenzhou railway

mixed passenger & freight HSR line from Ningbo to Wenzhou. 250 279 27 October 2005 28 September 2009
Xiamen–Shenzhen
Xiamen–Shenzhen railway
Mixed passenger & freight HSR line along the coast of Fujian and Guangdong from Xiamen to Shenzhen via Zhangzhou, Shantou & Huizhou. 250 502 23 November 2007 28 December 2013[9]

branch sections

Section
Railway line
Description Designed
speed
(km/h)

Length
(km)

Construction
start date

Open date
Weifang–Yantai
Tianjin–Weifang–Yantai high-speed railway (section)
Railway line linking Weifang to Yantai. Currently under construction.[10] 350 236 31 October 2020 2024 (expected)
Qingdao–Rongcheng
Qingdao–Rongcheng intercity railway
Intercity railway connecting Qingdao and Rongcheng. 250 299 10 October 2010 16 November 2016
Ningbo–Wenling
Ningbo–Taizhou–Wenzhou–Fuzhou high-speed railway
Planned PDL along the coast from Wenzhou to Fuzhou. 300+ 338[11] TBA TBA

See also

References

  1. ^ "李学勇考察连盐铁路要求加快推进苏北铁路网建设". www.gov.cn. Retrieved 2019-07-05.
  2. ^ "铁老大"八纵八横"来了 高铁或将终结短途时代?".
  3. ^ "World's fastest railway in frigid regions starts operation". Xinhua News Agency. 2012-12-01. Archived from the original on 2014-11-20.
  4. ^ "定了!福建省中长期铁路网最新规划来了!看看有没有经过你家?(2)". Archived from the original on 2021-01-30.
  5. ^ "福厦高铁九龙江特大桥:筑梦福厦高铁_福建图说_海峡网". www.hxnews.com. Retrieved 2019-07-03.
  6. ^ a b "福厦高铁总投577.43亿 至2020年两地有望1小时直达(xmhouse.com)". news.xmhouse.com. Retrieved 2019-07-03.
  7. ^ "福厦高铁全线动工 通车后福州到厦门需1小时左右 -民生 - 东南网". fjnews.fjsen.com. Retrieved 2019-07-03.
  8. ^ "漳州至汕头高铁预可研通过审查_铁路". www.sohu.com. Retrieved 2021-01-24.
  9. ^ "Xiamen–Shenzhen High Speed Railway opens to traffic". China Daily. 2013-12-28. Retrieved 2013-12-29.
  10. ^ "省政府召开潍烟高铁、莱荣高铁项目建设动员大会". 2020-09-10. Retrieved 2022-09-18.{{cite web}}: CS1 maint: url-status (link)
  11. ^ "宁波到温州也要修高铁了,时速300公里以上,全长338公里_台州". www.sohu.com. Retrieved 2021-01-24.