Beatrice Power Station
Jump to navigation
Jump to search
Beatrice Power Station | |
---|---|
Country | United States |
Location | Blakely Township, Gage County; near Beatrice, Nebraska |
Coordinates | 40°19′47″N 96°48′29″W / 40.32972°N 96.80806°WCoordinates: 40°19′47″N 96°48′29″W / 40.32972°N 96.80806°W |
Status | Operational |
Construction began | June 26, 2003 |
Commission date | January 7, 2005 |
Construction cost | US$190 million |
Owner(s) | NPPD |
Thermal power station | |
Primary fuel | Natural gas |
Combined cycle? | Yes |
Power generation | |
Nameplate capacity | 250 MW |
Beatrice Power Station is a natural gas-fired combined cycle power station in Gage County, Nebraska, United States. It has installed capacity of 250 MW, including two combustion turbines with capacity of 80 MW each and one steam turbine with capacity of 90 MW, provided by Alstom.[1][2] The project was approved in April 2002, construction of the power station started on June 26, 2003, and it was commissioned on January 7, 2005.[2]
References
- ^ "ALSTOM wins 93.7 MW steam turbine order for Nebraska". Power Engineering. Pennwell Corporation. 2003-05-02. Retrieved 2012-01-30.
- ^ a b "CCGT Plants in Iowa, Kansas & Nebraska". industcards.com. Archived from the original on 2013-01-03. Retrieved 2012-01-30.
External links
- "Beatrice Power Station Facts" (PDF). Nebraska Public Power District. Archived from the original (PDF) on 2015-09-05. Retrieved 2012-10-13.
Categories:
- Orphaned articles from February 2015
- All orphaned articles
- Infobox mapframe without OSM relation ID on Wikidata
- Coordinates not on Wikidata
- Thermal power station articles using Infobox power station
- Energy infrastructure completed in 2005
- Natural gas-fired power stations in Nebraska
- Buildings and structures in Gage County, Nebraska
- 2005 establishments in Nebraska
- All stub articles
- United States power station stubs
- Pages using the Kartographer extension