Bang Bamru railway station
Bang Bamru บางบำหรุ | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() Facade of Bang Bamru Station. September 2021. | |||||||||||||||||||||
General information | |||||||||||||||||||||
Location | Soi Sirinthorn 4, Bang Phlat Sub-district, Bang Phlat District, Bangkok (Southern Line station) Wat Chalo Sub-district, Bang Kruai District, Nonthaburi Province (Light Red Line station) Thailand | ||||||||||||||||||||
Coordinates | 13°47′30″N 100°28′39″E / 13.7918°N 100.4776°ECoordinates: 13°47′30″N 100°28′39″E / 13.7918°N 100.4776°E | ||||||||||||||||||||
Owned by | State Railway of Thailand | ||||||||||||||||||||
Operated by | State Railway of Thailand | ||||||||||||||||||||
Line(s) | |||||||||||||||||||||
Platforms | 3 (Mainline) 4 (Light Red Line) | ||||||||||||||||||||
Connections | ![]() | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | At-grade | ||||||||||||||||||||
Platform levels | 7 | ||||||||||||||||||||
Disabled access | Yes | ||||||||||||||||||||
Other information | |||||||||||||||||||||
Station code | บำ., RW05 | ||||||||||||||||||||
Classification | Class 1 | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 2 August 2021 | ||||||||||||||||||||
Rebuilt | September 2009 | ||||||||||||||||||||
Electrified | 25 kV AC overhead line | ||||||||||||||||||||
Services | |||||||||||||||||||||
| |||||||||||||||||||||
Location | |||||||||||||||||||||
![]() |
Bang Bamru railway station is a railway station located at Bang Phlat Subdistrict, Bang Phlat District, Bangkok. It is a class 1 station and serves two systems operated by the State Railway of Thailand, Southern Line and the SRT Light Red Line. It is located 17.94 kilometres (11.1 mi) from Bangkok railway station.
History
Bang Bamru railway station originally opened as a single wooden building with concrete platforms with a junction for a rail line to Northern Phra Nakhon Power Station at Bang Kruai for Lignite Coal trains from the Mae Mo Mines, Lampang. It was rebuilt to form a larger station with a concrete structure. And again in September 2009 to the current modern, concrete building with platforms also for the SRT Light Red Line project.
Station layout
G | Passenger building | Exit 1, passenger service center, ticket vending room, ticket vending machines, shops |
Southern HSR | ||
Side platform, doors will open on the left | ||
1 | ||
3 | ||
Island platform | ||
4 | ||
2 | ||
Side platform, doors will open on the left | ||
B Station tunnel |
- | Exit 2, Tunnel between platforms and passenger building |
Services
Light Red Line
Terminus | Days | First train | Last train | |||
---|---|---|---|---|---|---|
Light Red Line | ||||||
Platform 1 | ||||||
Taling Chan | Mon - Sun | 06:10 | 19:45 | |||
Platform 2 | ||||||
Bang Sue | Mon - Sun | 06:10 | 19:40 |
Southern Line
As of 6 January 2022, 16 trains serve Bang Bamru railway station (excluding services on the Light Red Line).[1][2]
Outbound
Train No. | Type | Origin | Bang Bamru | Terminus | Notes | ||||
---|---|---|---|---|---|---|---|---|---|
Station | Depart | Arrive | Stop (min.) | Depart | Station | Arrive | |||
43 | Special Express diesel railcar | Bangkok | 07:50 | 08:27 | 1 | 08:28 | Surat Thani | 18:50 | |
261 | Ordinary | Bangkok | 09:20 | 09:56 | 1 | 09:57 | Hua Hin | 14:15 | |
171 | Rapid | Bangkok | 12:30 | 13:20 | 1 | 13:21 | Su-ngai Kolok | 10:50 | |
31 | Special Express "Thaksinarath" | Bangkok | 14:30 | 15:09 | 1 | 15:10 | Hat Yai Junction | 07:25 | |
37 | Special Express | Bangkok | 15.10 | 15.50 | 1 | 15.51 | Su-ngai Kolok | 12.30 | |
169 | Rapid | Bangkok | Yala | Due to the impacts of the COVID-19 pandemic, will not be served | |||||
355 | Commuter | Bangkok | 16:40 | 17:15 | 1 | 17:16 | Nong Pladuk Junction | 18:26 | Due to the impacts of the COVID-19 pandemic, will be served to Suphan Buri (20:10) on Sundays only |
83 | Express | Bangkok | 17:00 | 17:41 | 1 | 17:42 | Trang | 08:50 | |
173 | Rapid | Bangkok | Nakhon Si Thammarat | Due to the impacts of the COVID-19 pandemic, will not be served | |||||
167 | Rapid | Bangkok | 18.30 | 19.10 | 1 | 19.11 | Kantang | 12.05 | |
85 | Express | Bangkok | 19:30 | 20:11 | 1 | 20:12 | Nakhon Si Thammarat | 12:05 | |
39 | Special Express diesel railcar | Bangkok | 22:05 | 22:42 | 1 | 22:43 | Surat Thani | ||
41 | Special Express diesel railcar | Bangkok | Yala | Due to the impacts of the COVID-19 pandemic, will not be served |
Inbound
Train No. | Type | Origin | Bang Bamru | Terminus | Notes | ||||
---|---|---|---|---|---|---|---|---|---|
Station | Depart | Arrive | Stop (min.) | Depart | Station | Arrive | |||
174 | Rapid | Nakhon Si Thammarat | Bangkok | Due to the impacts of the COVID-19 pandemic, will not be served | |||||
42 | Special Express diesel railcar | Yala | Bangkok | Due to the impacts of the COVID-19 pandemic, will not be served | |||||
44 | Special Express diesel railcar | Surat Thani | 21:05 | 08:29 | 1 | 08:30 | Bangkok | 09:10 | |
168 | Rapid | Kantang | 12.55 | 06.53 | 1 | 06.54 | Bangkok | 07.35 | |
356 | Commuter | Nong Pladuk Junction | 06:03 | 07:26 | 1 | 07:27 | Bangkok | 08:10 | Due to the impacts of the COVID-19 pandemic, will be served from Suphan Buri (04:00) to Bangkok (07:55) on Mondays only |
86 | Express | Nakhon Si Thammarat | 15:20 | 07:43 | 1 | 07:44 | Bangkok | 08:25 | |
170 | Rapid | Yala | Bangkok | Due to the impacts of the COVID-19 pandemic, will not be served | |||||
84 | Express | Trang | 17:00 | 09:24 | 1 | 09:25 | Bangkok | 10:05 | |
172 | Rapid | Su-ngai Kolok | 12:00 | 10:33 | 1 | 10:34 | Bangkok | 11:15 | |
32 | Special Express "Thaksinarath" | Hat Yai Junction | 17:45 | 10:48 | 1 | 10:49 | Bangkok | 11:30 | |
38 | Special Express | Su-ngai Kolok | 14.20 | 12.03 | 1 | 12.04 | Bangkok | 12.45 | |
40 | Special Express diesel railcar | Surat Thani | 10:25 | 20:29 | 1 | 20:30 | Bangkok | 21:10 | |
262 | Ordinary | Hua Hin | 14:30 | 19:37 | 1 | 19:38 | Bangkok | 20:20 |
Bus services
The following BMTA routes serve this station:
- 79 (Borommaratchachonnani Depot – Southern Bus Terminal (Pinklao))
- 208 (Taling Chan – Arun Amarin) (Loop)
- 515 (CentralPlaza Salaya – Victory Monument)
- 539 (Om Noi – Victory Monument)
Gallery
Platform 4 serves SRT Light Red Line trains towards Bang Sue station.
References
- ^ "Check train schdeule". State Railway of Thailand. Archived from the original on 2022-01-05. Retrieved 5 January 2022.
- ^ "การรถไฟฯ จัดเต็ม พ่วงตู้โดยสารจนเต็มหน่วยลากจูง และพร้อมเพิ่มขบวนรถพิเศษรองรับการเดินทางของประชาชนให้เพียงพอต่อความต้องการใน ช่วงเทศกาลปีใหม่ 2565 ย้ำยังให้บริการสถานีต้นทางและปลายทางที่หัวลำโพงตามเดิม" [SRT couples passenger cars to full locomotive's capacity, ready to increase special trains supplying demand in 2022 New Year festival, and emphasizes Hua Lamphong is origin and destination station as usual] (in Thai). State Railway of Thailand. 30 December 2021. Archived from the original on 1 January 2022. Retrieved 1 January 2022.