Marathon Digital

From Justapedia, unleashing the power of collective wisdom
(Redirected from Marathon Patent Group)
Jump to navigation Jump to search
Marathon Digital
FormerlyMarathon Patent Group
NasdaqMARA
Websitewww.marathondh.com

Marathon Digital Holdings, Inc. is a digital asset technology company, which engages in mining cryptocurrencies, with a focus on the blockchain ecosystem and the generation of digital assets. The company was founded on February 23, 2010 and is headquartered in Las Vegas, NV.[1]

The company was formerly known as Marathon Patent Group and was the patent holding company that is the parent of Uniloc, allegedly a patent troll company.[2][3] Marathon purchased patents related to encryption in the 2010s[citation needed] and in 2021 it was known for its purchases of bitcoin[4] and bitcoin mining equipment[5] and a joint venture to use 37 MW from the Hardin Generating Station Montana coal plant to power an adjacently-constructed Marathon bitcoin data center.[6]

The company changed its name to Marathon Digital Holdings, effective March 1, 2021. Its chief executive officer is Fred Thiel.[7]

See also

References

  1. ^ "Marathon Digital Holdings Inc Stock Quote". 2021-02-05. Retrieved 2021-02-10.
  2. ^ Mullin, Joe (2017-06-06). "How one patent troll is desperately trying to stay in East Texas". Ars Technica. Retrieved 2021-02-10.
  3. ^ Crecente, Brian (2012-07-23). "Uniloc founder says he's not a 'patent troll', reacts to 'disgusting' 'Minecraft' fan emails". Polygon. Retrieved 2021-02-10.
  4. ^ Randewich, Noel (2021-02-10). "Musk's bitcoin bet fuels gains in companies already invested". Reuters. Retrieved 2021-02-10 – via www.reuters.com.
  5. ^ "Crush the Crypto Market with Marathon Patent Group". 2021-02-05. Retrieved 2021-02-10.
  6. ^ "Bitcoin miner Marathon signs for coal-fired electricity in Montana". www.datacenterdynamics.com. Retrieved 2021-08-05. Bitcoin mining company Marathon Patent Group has announced plans to build a specialized Bitcoin data center in Montana. The facility will use cheap coal-fired electricity, backed by utility Beowulf Energy, which will take a stake in Marathon. In the joint venture, Beowulf gets part-ownership of Marathon, but Marathon keeps the Bitcoin output from a data center that will use an estimated 37MW of power from Beowulf's 119MW Hardin Generating Station in Big Horn County, Montana. Marathon will pay $0.028/kWh for the energy, which is about a quarter of the average US domestic rate of around $0.11/kWh.{{cite web}}: CS1 maint: url-status (link)
  7. ^ Ostroff, Caitlin; Spegele, Brian (2021-05-21). "Bitcoin Miners Are Giving New Life to Old Fossil-Fuel Power Plants". Wall Street Journal. Retrieved 23 May 2021.

External links

  • Official website
  • Business data for Marathon Digital Holdings, Inc.: