Doncaster Works

From Justapedia, unleashing the power of collective wisdom
(Redirected from Doncaster railway works)
Jump to navigation Jump to search

Flying Scotsman at Doncaster Works in July 2003
Doncaster works plate.

Doncaster Railway Works is a railway workshop located in Doncaster, England.

Also referred to as 'The Plant", it was established by the Great Northern Railway in 1853, replacing the previous works in Boston and Peterborough. Until 1867 it undertook only repairs and maintenance. Today the remaining part is operated by Wabtec.

History

In 1866, Patrick Stirling was appointed as Locomotive Superintendent, and the first of the 875 class was built in 1886. At this time the works also began building new coaches: in 1873 the first sleeping cars; in 1879 the first dining cars in the United Kingdom; and in 1882 the first corridor coaches. In 1891, 99 locomotives, 181 carriages and 1,493 wagons were built.

Among the locomotives the works produced were the Stirling Singles, the Ivatt Atlantics and the Gresley Pacifics, including the world-famous Flying Scotsman, the first locomotive to achieve 100 mph and also run from London King's Cross to Edinburgh Waverley non-stop; and Mallard which achieved the top speed of 126 mph on 3 July 1938 to become the world's fastest steam locomotive, a record that she still holds to the present day. These have hauled such trains as the Flying Scotsman, Silver Jubilee, Coronation and the Elizabethan. Doncaster also constructed the carriages for the last of these.

The works continued to build a variety of rolling stock. During World War II, like other workshops it joined in the war effort, producing, among other things, Horsa gliders for the D-Day airborne assault. The carriage building shop was destroyed by fire in 1940. New buildings in 1949 were designed with the British Railways Mark 1 all-steel carriages in mind.

In 1957, BR Standard Class 4 76114, the last of 2,228 steam locomotives, was completed.[1][2] In November 1963 60009 Union of South Africa was the last of an estimated 10,000 steam locomotives to be overhauled at Doncaster Works.[3] Carriage building finished in 1962, but the works was modernised with the addition of a diesel locomotive repair shop. Under British Rail Engineering Limited, new diesel shunters and 25 kV electric locomotives have been built, plus Class 56 and Class 58 diesel-electric locomotives.

In October 1987, the wagon works was sold by the British Rail Board to RFS Industries in a management buyout. In 1998 RFS Industries was purchased by Westinghouse Air Brake Company and in March 2000 rebranded Wabtec.[4][5]

In 2007, Bombardier Transportation closed its part of the works.[6][7] In early 2008 the main locomotive repair shop which was built on the Crimpsall was demolished to make way for housing. Wabtec continues to conduct carriage refurbishment at the Doncaster site.[8]

See also

References

  1. ^ Last Steam Locomotive Built at Doncaster Railway Gazette 25 October 1957 page 490
  2. ^ End of an Era at Doncaster The Railway Magazine issue 680 December 1957 page 819
  3. ^ Last Steam Overhaul at Doncaster The Railway Magazine issue 752 December 1963 page 118
  4. ^ New owner for RFS Rail Express issue 25 June 1998 page 11
  5. ^ Wabtec is new name for RFS Rail issue 380 5 April 2000 page 13
  6. ^ Closure at Plant Works means end of the line for 150 years of history Archived 14 April 2019 at the Wayback Machine Doncaster Free Press 20 December 2007
  7. ^ Remains of Plants Works set to close Archived 14 April 2019 at the Wayback Machine Sheffield Star 20 December 2007
  8. ^ Keeping the Wheels in Motion Wabtec
  • Larkin, E. J.; Larkin, J. G. (1988). The Railway Workshops of Great Britain 1823-1986. Macmillan Press.
  • Simmons, J. (1986). The Railway in Town and Country. Newton Abbot: David & Charles.

Further reading

External links